Search results for: 'start+up'
- TT-5852 MASCOTT PLUS 25-30 CROSSLAPPER AND MONO_1AB_27-3000 NEEDLE LOOMTT-5852 MASCOTT PLUS 25-30 CROSSLAPPER AND MONO_1AB_27-3000 NEEDLE LOOM Learn More
- YY-1366 (USERS MANUAL) BAG CLOSING MACHINE HEAD, INSTRUCTION MANUALYY-1366 BAG CLOSING MACHINE HEAD, INSTRUCTION MANUAL FOR OPENRATOR SAFETY: - THIS MANUAL BOOK CONTAINS INSTRUCTIONS AND PRECAUTIONS FOR USING THE BAG CLOSING MACHINE HEAD. BE SURE TO READ AND UNDERSTAND THE MANUAL BOOK BEFORE USING THE MACHINES. - KEEP THIS MANUAL BOOK NEAR THE SEWING MACHINE FOR REFERENCE. BE SURE TO ATTACH THIS MANUAL BOOK TO THE MACHINE WHEN LENDING OR TRANSFER IT TO ANOTHER PERSON OR COMPANY. - PLEASE CONTACT THIS MANUAL BOOK FROM US IF IT LOST. - THE CONTENTS OF THIS MANUAL BOOK ARE SUBJECT TO CHANGE WITHOUT PRIOR NOTICE FOR IMPROVEMENT AND SAFETY PURPOSE. Learn More
- T-1652 SGT 400 GAS TURBINE, 50Hz, YEAR 2017, 11 KV, 12.9 MWT-1652 SGT 400 GAS TURBINE, 50Hz, YEAR 2017, 11 KV, 12.9 MW SGT 400 GAS TURBINE TYPE: STANDARD BRAND: SIEMENS CATEGORY: ENGINES/GENERATORS/MOTORS/TRANSMISSIONS SUBCATEGORY: TURBINE IN STOCK: YES CONDITION: EXCELLENT TYPE: UNUSED SGT-400 GAS TURBINE GENERATOR SET, WITH INTEGRAL LOCAL EQUIPMENT ROOM: UNIT(S) TO BE SUPPLIED ARE UNUSED, WITH ZERO RUNNING HOURS, NEVER INSTALLED THESE UNITS HAVE BEEN STORED INDOORS SINCE MANUFACTURE. QUANTITY: 2 Learn More
- TT-2153 SIEMENS SGT-800 GAS TURBINE, 54 MW, 11 KV, 50 Hz AND 1500 RPM, FUEL NATURAL GAS, FREQUENCY 50/60 HzTT-2153 SIEMENS SGT-800 GAS TURBINE, 54 MW, 11 KV, 50 Hz AND 1500 RPM, FUEL NATURAL GAS, FREQUENCY 50/60 Hz GROSS EFFICIENCY 38.86.0% HEAT RATE9, 256 KJ/KWH UNUSED CONDITION: EXCELLENT (NEW SURPLUS) TURBINES STORED TO SIEMENS RECOMMENDATION. NOTE: THIS IS A PACKAGE DEAL AND REQUIRES BUYER TO PURCHASE ALL 3 UNITS. POI AND POF REQUIRED UPFRONT. QUANTITY: 3 Learn More
- TT-3267 GENERAL ELECTRIC / AEG-KANIS PG 5341 GAS TURBINE, 50Hz, YEAR 1982TT-3267 GENERAL ELECTRIC / AEG-KANIS PG 5341 GAS TURBINE, 50Hz, YEAR 1982 YEAR OF CONSTRUCTION 1982 CONDITION USED MACHINE TYPE: GAS TURBINE MANUFACTURER: GE / GENERAL ELECTRIC / AEG-KANIS MODEL: PG 5341 “P” YEAR OF CONSTRUCTION: 1982 CONDITION: EXCELLENT (USED) UPDATE: 12.09.2023 RATED POWER: 25MW (EL) EXHAUST GAS TEMPERATURE: 486°C FUEL: FUEL OIL, DIESEL TOTAL RATED THERMAL INPUT: 88,9 MW FREQUENCY: 50Hz SCOPE OF SUPPLY: COMPLETE PLANT WITH 4X: TURBINE-GEARBOX-GENERATOR AND AUXILIARIES Learn More
- C-3994 BARGEMOUNTED POWER PLANT, CAPACITY 220MW
C-3994 BARGEMOUNTED POWER PLANT, CAPACITY 220MW
A. ONCE THROUGH STEAM GENERATOR
B. BARGE
C. CHILLERS
D. AIR COMPRESSOR
E. GAS TURBINE
F. STEAM TURBINE
G. FEEDWATER SYSTEM
H. CLOSED COOLING WATER SYSTEM
I. AUXILIARY COOLING WATER SYSTEM
J. CONDENSATE POLISHING UNIT (CPU)
K. WASTE WATER SYSTEM
L. PLANT ELECTRICAL SYSTEM
M. BLACK START DG SET
N. PLANT CONTROLS AND INSTRUMENTATION
O. PLANT FIRE FIGHTING SYSTEM
P. START UP VACUUM SYSTEM
Q. STEAM TURBINE DEAERATING CONDENSERQUANTITY: 1 PLANT
Learn More - YY-1365 CONTINUOUS PRODUCTION LINE FOR IMPREGNATION, DRYING, ABRASIVE SPRAY, HEAT-SETTING OF SYNTHETIC FIBERS FOR ABRASIVE WADDINGS, WITH AIRLAY CARDING MACHINE AND FIBER PREPARATIONREFERENCE NUMBER: YY-1365 CONTINUOUS PRODUCTION LINE FOR IMPREGNATION, DRYING, ABRASIVE SPRAY, HEAT-SETTING OF SYNTHETIC FIBERS FOR ABRASIVE WADDINGS, WITH AIRLAY CARDING MACHINE AND FIBER PREPARATION DETAILS: MAIN FEATURES: - THREE LAYERS OVEN: TWO UPPER DRYING LAYERS WITH LENGTH OF 6+ 6 METERS; ONE LOWER CURING LAYER WITH A LENGTH OF 6 METERS; - HEATING: BY DIRECT HEATING WITH AUTOMATIC BURNERS; - CONVEYOR WIDTH: 2200mm; - WORKING WIDTH: 2000mm; - MAX DRYING AND POLYMERISATION TEMPERATURE: 230°C; - HEATING POWER: 4 BURNERS 350 KW EACH ONE, ABOUT TOTAL 1.400 KW; - VENTILATION: SEMI-CLOSED SYSTEM WITH 4 CENTRIFUGAL VENTILATORS; - ADJUSTABLE CONVEYOR SPEED BY A.C. MOTORS; - INSTALLED ELECTRIC POWER: 200 KW. APPROX.; - MECHANICAL SPEED: 2÷15 METERS PER MINUTE; - CONVEYOR DRIVING: BY A.C. MOTORS; - MANUFACTURED ARTICLE: SYNTHETIC FIBERS ABRASIVE WADDING. Learn More
- YASHA LIST-1310-B FOR LUMMUS COTTON GIN EQUIPMENT LISTYASHA LIST-1310-B FOR LUMMUS COTTON GIN EQUIPMENT LIST American Plant & Equipment is dedicated to providing high-quality industrial machinery and equipment for various manufacturing and processing needs. Below is a detailed list of Lummus Cotton Gin Equipment, designed for efficient cotton processing. These machines are engineered to enhance productivity, reduce waste, and ensure high-quality output in the cotton ginning process. Each piece of equipment is described with its specific function and technical specifications, ensuring you have the right tools for optimal performance in your operations. Learn More
- YASHA LIST-1310 FOR LUMMUS COTTON GIN EQUIPMENT LISTYASHA LIST-1310 FOR LUMMUS COTTON GIN EQUIPMENT LIST Learn More
- TT-6645 GE FRAME 6B GAS TURBINE, YEAR 1981TT-6645 GE FRAME 6B GAS TURBINE, YEAR 1981 1. 2X GE FRAME 6B GAS TURBINES 2. TECHNICAL SUMMARY 3. GAS TURBINES: TWO GE MS 6001 B GAS TURBINES PAIRED WITH AEG GENERATORS (TYPE S7102/2). QUANTITY: 2 Learn More