YY-2894 NEW SIEMENS SGT 400, YEAR 2018
SIEMENS SGT 400 (12.9 MW) GAS TURBINE
· 11-STAGE COMPRESSOR, 6 COMBUSTION CHAMBERS, 2-STAGE POWER TURBINE
· GAS FUEL SYSTEM
· DLE COMBUSTION SYSTEM
· HOT-END DRIVE
· 2-SHAFT ENGINE
· LEFT-HAND EXHAUST
· MAIN LUBRICATION PUMP
· EQUIVALENT OPERATING HOURS : 0H
· TOTAL STARTS : 0
· NEW, NEVER INSTALLED OR COMMISSIONED
QUANTITY: 1
Learn More
TT-4735 SOLAR TURBINE TAURUS 60 – NEW, 5.67MW, YEAR 2019
BRAND: SOLAR
MODEL TAURUS 60
TYPE GAS TURBINES
CONDITION NEW
YEAR 2019
PACKAGE: BY SOLAR
HOURS OF OPERATION: 0
FUEL CAPABILITY: NATURAL GAS/LIQUID
COMBUSTION STANDARD: STANDARD
BRAND KATO
MODEL TAURUS 60
FREQUENCY 50Hz
Learn More
YY-3065 TM2500 GAS TURBINE PACKAGE, 23MW, OVERHAULED 2018, WITH SPARE TURBINE LM2500
KEY POINTS:
1. THE UNIT IS IMMEDIATELY OPERATIONAL, FACILITATING SWIFT INITIATION OF POWER GENERATION.
2. UNDERWENT A SIGNIFICANT OVERHAUL IN 2018, WITH ABOUT 14,600 HOURS OF OPERATION SINCE.
3. COMPATIBLE WITH NATURAL GAS AND DIESEL, OFFERING FLEXIBILITY IN FUEL USE.
4. SOLD IN ITS CURRENT CONDITION, INCLUDING EXTRA COMPONENTS (TM2500 SPARE HOT SECTION AND A BRUSH GENERATOR NEEDING OVERHAUL).
QUANTITY AVAILABLE: 1
Learn More
TT-3851 TITAN T250 SOLAR TURBINES, NATURAL GAS TURBINE, 22.37 MW, YEAR 2017
22.37 MW
NEW / NEVER-USED
30,000 HP SOLAR TURBINES TITAN 250 PACKAGE IS A RARE SURPLUS OPPORTUNITY AND OFFERS EXCELLENT ECONOMICS TO A SELECT BUYER.
QUANTITY: 1 Learn More
YY-2425 LM2500 PE SAC, 22.4 MW, WITH GE 6 STAGE POWER TURBINE, GAS TURBINES, QUANTITY 2
ITEM 001
2500 HOURS AFTER ENGINE OVERHAUL
ITEM 002
6500 HOURS AFTER ENGINE OVERHAUL
Learn More
TT-1886 KAWASAKI PU4000B-ER GAS TURBINE POWER PLANT 51.2MW 60Hz, (16 X 3.2MW), YEAR 2008
KAWASAKI PU4000B-ER GAS TURBINE POWER PLANT
51.2MW 60Hz
(16 X 3.2MW)
MAIN SPECIFICATIONS
GAS TURBINE MODEL: M1T-23
BRAND: KAWASAKI
POWER OUTPUT: 3,200KWE
FREQUENCY & VOLTAGE: 60Hz & 6600V
YEAR OF PRODUCTION: 2008
RUNNING HOURS: ABOUT 60 HOURS
FUEL OIL: NATURAL GAS
PLANT AUXILIARY EQUIPMENT: 1 SET
Learn More
T-1652 SGT 400 GAS TURBINE, 50Hz, YEAR 2017, 11 KV, 12.9 MW
SGT 400 GAS TURBINE
TYPE: STANDARD
BRAND: SIEMENS
CATEGORY: ENGINES/GENERATORS/MOTORS/TRANSMISSIONS
SUBCATEGORY: TURBINE
IN STOCK: YES
CONDITION: EXCELLENT
TYPE: UNUSED
SGT-400 GAS TURBINE GENERATOR SET, WITH INTEGRAL LOCAL EQUIPMENT ROOM:
UNIT(S) TO BE SUPPLIED ARE UNUSED, WITH ZERO RUNNING HOURS, NEVER INSTALLED
THESE UNITS HAVE BEEN STORED INDOORS SINCE MANUFACTURE.
QUANTITY: 2 Learn More
TT-1468 SIEMENS SGT 500 GAS TURBINES – NEW, YEAR 2007, 18.47MW EACH
SGT500 NEW AND NEVER USED UNITS
SIEMENS SGT TURBINES
YEAR 2007
POWER OUTPUT 18.47MW EACH
DUAL FUEL GAS & LIQUID
QUANTITY: 2
Learn More