YY-3065 TM2500 GAS TURBINE PACKAGE, 23MW, OVERHAULED 2018, WITH SPARE TURBINE LM2500
KEY POINTS:
1. THE UNIT IS IMMEDIATELY OPERATIONAL, FACILITATING SWIFT INITIATION OF POWER GENERATION.
2. UNDERWENT A SIGNIFICANT OVERHAUL IN 2018, WITH ABOUT 14,600 HOURS OF OPERATION SINCE.
3. COMPATIBLE WITH NATURAL GAS AND DIESEL, OFFERING FLEXIBILITY IN FUEL USE.
4. SOLD IN ITS CURRENT CONDITION, INCLUDING EXTRA COMPONENTS (TM2500 SPARE HOT SECTION AND A BRUSH GENERATOR NEEDING OVERHAUL).
QUANTITY AVAILABLE: 1
Learn More
YY-2991 SIEMENS SGT-A05 GAS TURBINE MOBILE GENERATORS, 12 UNITS
MULTIPLE UNITS AVAILABLE
LOW HOUR AERO-DERIVATIVE GAS TURBINE PACKAGES
TOTAL QUANTITY: 12
Learn More
TT-3851 TITAN T250 SOLAR TURBINES, NATURAL GAS TURBINE, 22.37 MW, YEAR 2017
22.37 MW
NEW / NEVER-USED
30,000 HP SOLAR TURBINES TITAN 250 PACKAGE IS A RARE SURPLUS OPPORTUNITY AND OFFERS EXCELLENT ECONOMICS TO A SELECT BUYER.
QUANTITY: 1 Learn More
YY-2894 NEW SIEMENS SGT 400, YEAR 2018
SIEMENS SGT 400 (12.9 MW) GAS TURBINE
· 11-STAGE COMPRESSOR, 6 COMBUSTION CHAMBERS, 2-STAGE POWER TURBINE
· GAS FUEL SYSTEM
· DLE COMBUSTION SYSTEM
· HOT-END DRIVE
· 2-SHAFT ENGINE
· LEFT-HAND EXHAUST
· MAIN LUBRICATION PUMP
· EQUIVALENT OPERATING HOURS : 0H
· TOTAL STARTS : 0
· NEW, NEVER INSTALLED OR COMMISSIONED
QUANTITY: 1
Learn More
YY-2425 LM2500 PE SAC, 22.4 MW, WITH GE 6 STAGE POWER TURBINE, GAS TURBINES, QUANTITY 2
ITEM 001
2500 HOURS AFTER ENGINE OVERHAUL
ITEM 002
6500 HOURS AFTER ENGINE OVERHAUL
Learn More