Search results for: 'g'"'
- TT-2153 SIEMENS SGT-800 GAS TURBINE, 54 MW, 11 KV, 50 Hz AND 1500 RPM, FUEL NATURAL GAS, FREQUENCY 50/60 HzTT-2153 SIEMENS SGT-800 GAS TURBINE, 54 MW, 11 KV, 50 Hz AND 1500 RPM, FUEL NATURAL GAS, FREQUENCY 50/60 Hz GROSS EFFICIENCY 38.86.0% HEAT RATE9, 256 KJ/KWH UNUSED CONDITION: EXCELLENT (NEW SURPLUS) TURBINES STORED TO SIEMENS RECOMMENDATION. NOTE: THIS IS A PACKAGE DEAL AND REQUIRES BUYER TO PURCHASE ALL 3 UNITS. POI AND POF REQUIRED UPFRONT. QUANTITY: 3 Learn More
- J-4722 GE LM6000 PA GAS TURBINE, 42 MW, 50 Hz, DUAL FUEL, 10,500 VOLTSJ-4722 GE LM6000 PA GAS TURBINE, 42 MW, 50 Hz, DUAL FUEL, 10,500 VOLTS MAKE: GE MODEL: LM6000 PA YEAR: 1993 42 MW 50 Hz DUAL FUEL 10,500 VOLTS CONDITION: USED, 12,000 HOURS QUANTITY: 1 Learn More
- TT-3052 LM 2500 PE SAC GAS TURBINES, 22.5 MW OUTPUT, NATURAL GAS, 2400 HOURSTT-3052 LM 2500 PE SAC GAS TURBINES, 22.5 MW OUTPUT, NATURAL GAS, 2400 HOURS QUANTITY: 2 Learn More
- TT-3044 GE FRAME 9 GAS TURBINES, 123 MW, 50 Hz, 10500 VOLT, NATURAL GAS, 28,000 HOURS, YEAR 1997TT-3044 GE FRAME 9 GAS TURBINES, 123 MW, 50 Hz, 10500 VOLT, NATURAL GAS, 28,000 HOURS, YEAR 1997 QUANTITY: 2 Learn More
- TT-1886 KAWASAKI PU4000B-ER GAS TURBINE POWER PLANT 51.2MW 60Hz, (16 X 3.2MW), YEAR 2008TT-1886 KAWASAKI PU4000B-ER GAS TURBINE POWER PLANT 51.2MW 60Hz, (16 X 3.2MW), YEAR 2008 KAWASAKI PU4000B-ER GAS TURBINE POWER PLANT 51.2MW 60Hz (16 X 3.2MW) MAIN SPECIFICATIONS GAS TURBINE MODEL: M1T-23 BRAND: KAWASAKI POWER OUTPUT: 3,200KWE FREQUENCY & VOLTAGE: 60Hz & 6600V YEAR OF PRODUCTION: 2008 RUNNING HOURS: ABOUT 60 HOURS FUEL OIL: NATURAL GAS PLANT AUXILIARY EQUIPMENT: 1 SET Learn More
- YY-2991 SIEMENS SGT-A05 GAS TURBINE MOBILE GENERATORS, 12 UNITSYY-2991 SIEMENS SGT-A05 GAS TURBINE MOBILE GENERATORS, 12 UNITS MULTIPLE UNITS AVAILABLE LOW HOUR AERO-DERIVATIVE GAS TURBINE PACKAGES TOTAL QUANTITY: 12 Learn More
- YY-2425 LM2500 PE SAC, 22.4 MW, WITH GE 6 STAGE POWER TURBINE, GAS TURBINES, QUANTITY 2YY-2425 LM2500 PE SAC, 22.4 MW, WITH GE 6 STAGE POWER TURBINE, GAS TURBINES, QUANTITY 2 ITEM 001 2500 HOURS AFTER ENGINE OVERHAUL ITEM 002 6500 HOURS AFTER ENGINE OVERHAUL Learn More
- TT-3288 GEC ALSTHOM GAS TURBINE, 13.8 KV, 45400 KW, 60 Hz, YEAR 1998 OVERHAULED 2011TT-3288 GEC ALSTHOM GAS TURBINE, 13.8 KV, 45400 KW, 60 Hz, YEAR 1998 OVERHAULED 2011 GEC ALSTHOM GAS TURBINE 45400 KW GAS TURBINE MODEL NUMBER: GEC ALSTHOM 6551B QUANTITY: 1 Learn More
- YY-2985 COMPLETE AND UNUSED SGT-400 50Hz GAS TURBINE DRIVEN GENERATOR PACKAGESYY-2985 COMPLETE AND UNUSED SGT-400 50Hz GAS TURBINE DRIVEN GENERATOR PACKAGES THE SIEMENS SGT-400 FAST POWER GAS TURBINE GENERATOR SET IS A SYSTEM DESIGNED FOR RAPID DEPLOYMENT. QUANTITY: 5 Learn More
- YY-2435 GE TM 2500 GAS TURBINE, MOBILE POWER 24 MW, GE STEWART & STEVENSON MOBILE PACKAGE, QUANTITY 1YY-2435 GE TM 2500 GAS TURBINE, MOBILE POWER 24 MW, GE STEWART & STEVENSON MOBILE PACKAGE, QUANTITY 1 YEAR: 1998 QUANTITY: 1 Learn More