TT-4529 GENERAL ELECTRIC TURBINE GENERATOR – NEW, NATURAL GAS, 90MW, 60Hz, 7EA + HRSG COGENERATION PLANT, YEAR 2015
EQUIPMENT OVERVIEW
NEW / NEVER-USED SURPLUS
MANUFACTURED IN 2015
GE 71 EA 91.95 MW NATURAL GAS TURBINE
GE 7A6 121000 KVA 60 Hz 13000 V AIR-COOLED GENERATOR
COMPLETE WITH ACCESSORY BASE AND ANCILLARY EQUIPMENT
OPTIONALLY AVAILABLE HEAT RECOVERY STEAM GENERATOR (HRSG) AND ANCILLARY EQUIPMENT
CRATED AND PRESERVED TO OEM SCHEDULE IN CLIMATE CONTROLLED WAREHOUSES
Learn More
YY-2991 SIEMENS SGT-A05 GAS TURBINE MOBILE GENERATORS, 12 UNITS
MULTIPLE UNITS AVAILABLE
LOW HOUR AERO-DERIVATIVE GAS TURBINE PACKAGES
TOTAL QUANTITY: 12
Learn More
YY-2907 LM2500 PLUS PK- MDWG03 GAS TURBINE-GENERATOR PACKAGES, YEAR 2002, QUANTITY 2, 30 MW, 11 KV, 50 Hz
YEAR OF MANUFACTURE: 2002
YEAR COMMISSIONED: 2005
OPERATING HOURS: 55,000
HOURS AFTER LAST MO: ~5,000 ONLY
STATUS: ON FOUNDATION
FUEL: NATURAL GAS & LIQUID FUEL
QUANTITY: 2 Learn More
YY-2311 GE TM2500+ GENERATION 6 GENERATOR PACKAGE – 26 MW EACH, 11,000 V, 50/60 Hz, DIESEL OR NATURAL GAS, YEAR 2011
-AT 50 Hz THE UNITS ARE DESIGNED TO PRODUCE 26 MW OF POWER
-AT 60 Hz THE UNITS ARE DESIGNED TO PRODUCE 30 MW OF POWER
-DEPENDING ON LOCATION TEMPERATURE
-THESE ARE CONTINUOUS POWER UNITS
DETAILS:
1. 31MW CONTINUOUS RATED (GE ADVERTISED AT ISO CONDITIONS);
2. YEAR OF MANUFACTURE: 2011;
3. PACKAGE SN: 2011-TM006 AND 2011-TM008;
4. CURRENTLY CONFIGURED AS 11KV 50HZ, YET CAN OPERATE AT EITHER 50HZ OR 60HZ;
5. 2 UNITS AVAILABLE;
6. EQUIPMENT IS CONFIGURED TO OPERATE ON LIQUID FUEL OR NATURAL GAS;
7. CURRENT OPERATING HOURS AS OF JULY 30, 2022: TM006 – 1726 HOURS TM008 – 2174 HOURS;
8. HOURS REFLECT TOTAL TIME SINCE NEW:
HOURS MAY GO UP AS UNITS ARE STILL CONNECTED FOR EMERGENCY USE ONLY.
9. PRICE INCLUDES THE GT1 REPAIRS RECOMMENDED BY GE IN THE ATTACHED INVESTIGATIVE REPORT;
10. HPT REPLACEMENT ON GT1 ONLY:
- LEAD TIME FOR REPAIRS IS 12-14 WEEKS BASED ON CURRENT AVAILABILITY (SUBJECT TO CHANGE);
- SCOPE OF SUPPLY FOR EACH UNIT IS LISTED IN APPENDIX A.
Learn More