TT-8593 GE TM2500GEN08 MOBILE GAS TURBINE GENERATOR, 10.5KV, YEAR 2025
1. GE TM2500GEN08
2. YEAR: JUNE 2025
3. 10.5KV
4. DUAL FREQUENCY
5. DUAL FUEL
6. DRY LOW EMISSION
7. HOURS: 0
8. WARRANTY: ONE YEAR
QUANTITY: 1
Learn More
YY-2961 25 MW GAS TURBINE GENERATOR (GT 10B2 - SGT 600)
BRIEF PLANT HISTORY:
THE GT PACKAGE IS THE FAMOUS GT 10 B2 DLE PG WHICH WAS COMMISSIONED IN 2001 CONSISTING OF GAS TURBINE, GENERATOR AND ALL RELATED AUXILIARIES EQUIPMENT/SYSTEMS. IT IS IN EXCELLENT CONDITION AND AVAILABLE FOR IMMEDIATE SALE AND RELOCATION.
QUANTITY: 3
Learn More
YY-2311 GE TM2500+ GENERATION 6 GENERATOR PACKAGE – 26 MW EACH, 11,000 V, 50/60 Hz, DIESEL OR NATURAL GAS, YEAR 2011
-AT 50 Hz THE UNITS ARE DESIGNED TO PRODUCE 26 MW OF POWER
-AT 60 Hz THE UNITS ARE DESIGNED TO PRODUCE 30 MW OF POWER
-DEPENDING ON LOCATION TEMPERATURE
-THESE ARE CONTINUOUS POWER UNITS
DETAILS:
1. 31MW CONTINUOUS RATED (GE ADVERTISED AT ISO CONDITIONS);
2. YEAR OF MANUFACTURE: 2011;
3. PACKAGE SN: 2011-TM006 AND 2011-TM008;
4. CURRENTLY CONFIGURED AS 11KV 50HZ, YET CAN OPERATE AT EITHER 50HZ OR 60HZ;
5. 2 UNITS AVAILABLE;
6. EQUIPMENT IS CONFIGURED TO OPERATE ON LIQUID FUEL OR NATURAL GAS;
7. CURRENT OPERATING HOURS AS OF JULY 30, 2022: TM006 – 1726 HOURS TM008 – 2174 HOURS;
8. HOURS REFLECT TOTAL TIME SINCE NEW:
HOURS MAY GO UP AS UNITS ARE STILL CONNECTED FOR EMERGENCY USE ONLY.
9. PRICE INCLUDES THE GT1 REPAIRS RECOMMENDED BY GE IN THE ATTACHED INVESTIGATIVE REPORT;
10. HPT REPLACEMENT ON GT1 ONLY:
- LEAD TIME FOR REPAIRS IS 12-14 WEEKS BASED ON CURRENT AVAILABILITY (SUBJECT TO CHANGE);
- SCOPE OF SUPPLY FOR EACH UNIT IS LISTED IN APPENDIX A.
Learn More
TT-7894 GE FRAME 5PA GAS TURBINE GENERATOR – NEW, 26MW, 60 Hz
1. GE FRAME 5PA GAS TURBINE GENERATOR
2. BRAND NEW
3. BRAND: GENERAL ELECTRIC
4. CONDITION: BRAND NEW, NEVER INSTALLED
QUANTITY: 1
Learn More
YY-2907 LM2500 PLUS PK- MDWG03 GAS TURBINE-GENERATOR PACKAGES, YEAR 2002, QUANTITY 2, 30 MW, 11 KV, 50 Hz
YEAR OF MANUFACTURE: 2002
YEAR COMMISSIONED: 2005
OPERATING HOURS: 55,000
HOURS AFTER LAST MO: ~5,000 ONLY
STATUS: ON FOUNDATION
FUEL: NATURAL GAS & LIQUID FUEL
QUANTITY: 2 Learn More