YY-2311 GE TM2500+ GENERATION 6 GENERATOR PACKAGE – 26 MW EACH, 11,000 V, 50/60 Hz, DIESEL OR NATURAL GAS, YEAR 2011
-AT 50 Hz THE UNITS ARE DESIGNED TO PRODUCE 26 MW OF POWER
-AT 60 Hz THE UNITS ARE DESIGNED TO PRODUCE 30 MW OF POWER
-DEPENDING ON LOCATION TEMPERATURE
-THESE ARE CONTINUOUS POWER UNITS
DETAILS:
1. 31MW CONTINUOUS RATED (GE ADVERTISED AT ISO CONDITIONS);
2. YEAR OF MANUFACTURE: 2011;
3. PACKAGE SN: 2011-TM006 AND 2011-TM008;
4. CURRENTLY CONFIGURED AS 11KV 50HZ, YET CAN OPERATE AT EITHER 50HZ OR 60HZ;
5. 2 UNITS AVAILABLE;
6. EQUIPMENT IS CONFIGURED TO OPERATE ON LIQUID FUEL OR NATURAL GAS;
7. CURRENT OPERATING HOURS AS OF JULY 30, 2022: TM006 – 1726 HOURS TM008 – 2174 HOURS;
8. HOURS REFLECT TOTAL TIME SINCE NEW:
HOURS MAY GO UP AS UNITS ARE STILL CONNECTED FOR EMERGENCY USE ONLY.
9. PRICE INCLUDES THE GT1 REPAIRS RECOMMENDED BY GE IN THE ATTACHED INVESTIGATIVE REPORT;
10. HPT REPLACEMENT ON GT1 ONLY:
- LEAD TIME FOR REPAIRS IS 12-14 WEEKS BASED ON CURRENT AVAILABILITY (SUBJECT TO CHANGE);
- SCOPE OF SUPPLY FOR EACH UNIT IS LISTED IN APPENDIX A.
Learn More