Search results for: 'inc'
- Related search terms
- incline
- incline feeder
- incline co
- inch to m
- INC HT
-
YY-2471 5.5 MW, TAURUS T-60 NATURAL GAS TURBINE GENERATOR SET INCLUDING HRSG (STEAM BOILER) AND WHRU (WASTE HEAT RECOVERY), OUTPUT VOLTAGES AVAILABLE 380/415/460/575 (CAN BE 50 OR 60 Hz)YY-2471 5.5 MW, TAURUS T-60 NATURAL GAS TURBINE GENERATOR SET INCLUDING HRSG (STEAM BOILER) AND WHRU (WASTE HEAT RECOVERY), OUTPUT VOLTAGES AVAILABLE 380/415/460/575 (CAN BE 50 OR 60 Hz) QUANTITY: 1 Learn More -
The TM 2500 Mobile Gas Turbine GeneratorThe TM 2500 Mobile Gas Turbine Generator Standard Description Quantity: 2 Units Available Immediately. Learn More -
TT-8593 GE TM2500GEN08 MOBILE GAS TURBINE GENERATOR, 10.5KV, YEAR 2025TT-8593 GE TM2500GEN08 MOBILE GAS TURBINE GENERATOR, 10.5KV, YEAR 2025 1. GE TM2500GEN08 2. YEAR: JUNE 2025 3. 10.5KV 4. DUAL FREQUENCY 5. DUAL FUEL 6. DRY LOW EMISSION 7. HOURS: 0 8. WARRANTY: ONE YEAR QUANTITY: 1 Learn More -
TT-7894 GE FRAME 5PA GAS TURBINE GENERATOR – NEW, 26MW, 60 HzTT-7894 GE FRAME 5PA GAS TURBINE GENERATOR – NEW, 26MW, 60 Hz 1. GE FRAME 5PA GAS TURBINE GENERATOR 2. BRAND NEW 3. BRAND: GENERAL ELECTRIC 4. CONDITION: BRAND NEW, NEVER INSTALLED QUANTITY: 1 Learn More -
TT-7587 SIEMENS TG50D5/W701DS GAS TURBINE GENERATOR, 127.8 MW, YEAR 1995TT-7587 SIEMENS TG50D5/W701DS GAS TURBINE GENERATOR, 127.8 MW, YEAR 1995 1. SIEMENS WESTINGHOUSE TG50D5/W701DS 127.8 MW GAS TURBINE GENERATOR PACKAGES FOR SALE. THE TURBINE PACKAGES TOGETHER OFFER 255 MW READY TO SHIP EQUIPMENT. THIS TECHNOLOGY IS ONE OF THE MOST WIDESPREAD MIDDLE SIZE ENGINES (100-104 MW) FOR POWER GENERATION AND THE ONLY TURBINE OF ITS SIZE THAT CAN OPERATE ON HEAVY FUEL OIL (HFO). 2. THE UNITS ARE OFFERED WITH SOME OF THE REQUIRED BALANCE OF PLANT BY SEPARATE NEGOTIATION. 3. THESE UNITS WERE INSTALLED AND OPERATED IN A POWER STATION FROM 1996 UNTIL THE END OF 2004, WHEN THEY WERE DISMANTLED AS THE RESULT OF A PLANT UPGRADE. THE UNITS WERE PURCHASED AND UPGRADED BY THE BUYER TO 127.8 MW NOMINAL CAPACITY EACH. THEY ALSO FULLY REFURBISHED THE UNITS TO ZERO HOURS. THE TURBINES HAVE THE CAPABILITY OF BEING ABLE TO SWITCH BETWEEN NATURAL GAS AND LIQUID FUEL WHILE STILL OPERATING UNDER LOAD. QUANTITY: 2 Learn More -
TT-6644 CENTRAX GAS TURBINE GENERATOR, 2.5MW, YEAR 1981TT-6644 CENTRAX GAS TURBINE GENERATOR, 2.5MW, YEAR 1981 1. COMPLETE GAS TURBINE GENERATING SYSTEM 2. TOTAL RUNNING HOURS: 1546 QUANTITY: 1 Learn More -
TT-5848 SIEMENS SGT-400 NATURAL GAS TURBINE GENSETS, 13MW, 50Hz, YEAR 2022TT-5848 SIEMENS SGT-400 NATURAL GAS TURBINE GENSETS, 13MW, 50Hz, YEAR 2022 SIEMENS SGT-400 52MW (13MW X 4) NATURAL GAS TURBINE GENSETS QUANTITY: 4 Learn More -
YY-3279 SGT – 600 GAS TURBINE GENERATOR SET, WITH INTEGRAL LOCAL EQUIPMENT ROOMYY-3279 SGT – 600 GAS TURBINE GENERATOR SET, WITH INTEGRAL LOCAL EQUIPMENT ROOM UNIT(S) TO BE SUPPLIED ARE UNUSED, WITH ZERO RUNNING HOURS, NEVER INSTALLED. Learn More -
YY-2908 UNUSED 15.2MW SOLAR T 130 GAS TURBINE GENERATOR PACKAGES, QUANTITY 2, 22.789 KVA, 11 KV, 50 HzYY-2908 UNUSED 15.2MW SOLAR T 130 GAS TURBINE GENERATOR PACKAGES, QUANTITY 2, 22.789 KVA, 11 KV, 50 Hz YEAR OF MANUFACTURE: 2013/14 CONDITION: AS NEW OPERATING HOURS: 0 STATUS: INSTALLED FUEL: NG OR SYNGAS QUANTITY: 2 Learn More -
YY-2311 GE TM2500+ GENERATION 6 GENERATOR PACKAGE – 26 MW EACH, 11,000 V, 50/60 Hz, DIESEL OR NATURAL GAS, YEAR 2011YY-2311 GE TM2500+ GENERATION 6 GENERATOR PACKAGE – 26 MW EACH, 11,000 V, 50/60 Hz, DIESEL OR NATURAL GAS, YEAR 2011 -AT 50 Hz THE UNITS ARE DESIGNED TO PRODUCE 26 MW OF POWER -AT 60 Hz THE UNITS ARE DESIGNED TO PRODUCE 30 MW OF POWER -DEPENDING ON LOCATION TEMPERATURE -THESE ARE CONTINUOUS POWER UNITS DETAILS: 1. 31MW CONTINUOUS RATED (GE ADVERTISED AT ISO CONDITIONS); 2. YEAR OF MANUFACTURE: 2011; 3. PACKAGE SN: 2011-TM006 AND 2011-TM008; 4. CURRENTLY CONFIGURED AS 11KV 50HZ, YET CAN OPERATE AT EITHER 50HZ OR 60HZ; 5. 2 UNITS AVAILABLE; 6. EQUIPMENT IS CONFIGURED TO OPERATE ON LIQUID FUEL OR NATURAL GAS; 7. CURRENT OPERATING HOURS AS OF JULY 30, 2022: TM006 – 1726 HOURS TM008 – 2174 HOURS; 8. HOURS REFLECT TOTAL TIME SINCE NEW: HOURS MAY GO UP AS UNITS ARE STILL CONNECTED FOR EMERGENCY USE ONLY. 9. PRICE INCLUDES THE GT1 REPAIRS RECOMMENDED BY GE IN THE ATTACHED INVESTIGATIVE REPORT; 10. HPT REPLACEMENT ON GT1 ONLY: - LEAD TIME FOR REPAIRS IS 12-14 WEEKS BASED ON CURRENT AVAILABILITY (SUBJECT TO CHANGE); - SCOPE OF SUPPLY FOR EACH UNIT IS LISTED IN APPENDIX A. Learn More