- complete+plant
- DIESEL POWER PLANT 81.3MW WARTSILA 18V46 HFODELIVERED IN YEAR 2001 AND OPERATED UNDER WARTSILA O&M TILL END OF 2012 TOTAL OPERATING HOURS APPROXIMATELY 40,000 / ENGINES AND ALL IN GOOD CONDITION GENERATOR DRIVER 5 X WARTSILA 18 CYLINDER / 500 RPM HFO ENGINES TYPE 18V46 COMPLETE PLANT, ELECTRICAL OUTPUT 81.3MW 11KV / 50HZ FROM ALTERNATORS THE ENGINES HAVE COOLING TOWER COOLING SYSTEM AND COMPLETE SET OF AXILLARIES EQUIPMENT IS STILL INSTALLED AND IN A GOOD CONDITION Learn More
- K-2919 MAN-BHKW COMPLETE MODULES 500KW YEAR 2009
K-2919 MAN-BHKW COMPLETE MODULES 500KW YEAR 2009
ELECTRICAL POWER 500 KW
THERM. POWER 400 KW
FUEL: BIO OIL AND DIESEL
YEAR2009
ONLY BETWEEN 6000 AND 9000 HOURS
INCLUDING ELECTRICAL BOXES
HEAT EXCHANGER
CATALYSATORS
11 KV / 50 HZQUANTITY: 8
Learn More - NATURAL GAS FIRED CHP PLANT WITH JENBACHER 995KW 50HZ GAS GENERATORNATURAL GAS FIRED CHP PLANT WITH JENBACHER 995KW / 50HZ GAS GENERATOR DELIVERED IN YEAR 1997, TOTAL OPERATING HOURS 55,000 GENERATOR DRIVER JENBACHER 20 CYLINDER / 1500 RPM GAS ENGINES TYPE J320 GS N.L. COMPLETE PLANT, ELECTRICAL OUTPUT 995KW 400 / 230V / 40HZ FROM ALTERNATORS HEAT RECOVERY FOR 80 C DEGREE WATER AND STEAM BOILER 6 T/H AT 10 BAR ( SUPPL. FIRED) EQUIPMENT IS STILL INSTALLED AND IN A FAIR CONDITION Learn More
- K-8157 COAL FIRED POWER PLANT (2 X 50MW)
K-8157 COAL FIRED POWER PLANT (2 X 50MW)
ENERGY BOILERS (CAE)
TURBINE SYSTEMS
STEAM TURBINES (TA) - DSL ARE 50 - 1
-CONDENSING TURBINE WITH TWO ADJUSTABLE OUTLETS, SUCH AS "ACTING" ON A SINGLE LINE OF TREES, DESIGNED TO DRIVE THE AC GENERATOR DIRECT-TYPE TH 60-2
-IS COMPOSED OF TWO BODIES: THE BODY OF HIGH PRESSURE (CIP) AND MEDIUM AND LOW PRESSURE BODY (CMP + CJP)
-HAS TWO ADJUSTABLE OUTLETS (PLUG SOCKETS AND PLUG HEATING) AND FIVE FIXED DOSES REGENERATIVE CIRCUIT FEEDSQUARES OF 600 CARS OVER T/H (WITH BUCKET WHEEL AND ARM LENGTH 12 M) - 4 PCS
-TIP HAMMER CRUSHERS CCA - 160 TO 2 PIECES
- RUBBER BANDS COAL TRANSPORTTHE MAIN EQUIPMENT IS ADDED TO ENSURE PROPER OPERATION FOLLOWING:
- SOLID FUEL STORAGE
- INSTALLATIONS AND INDUSTRIAL WATER SUPPLIES AND WASTEWATER DISCHARGE
- INSTALLATION OF EXHAUST HYDRAULIC SLAG
- WATER TREATMENT STATION
TO USE COAL, WEIGHT 88%, 12% NATURAL GASQUANTITY: 1
Learn More - K-8046 BBC-ABB 300 MW COAL-OIL-GAS BIOMASS FIRED PLANT YEAR 2006
K-8046 BBC-ABB 300 MW COAL-OIL-GAS BIOMASS FIRED PLANT YEAR 2006
COAL FIRED STEAM TURBINE POWER PLANT
300MW
COAL OIL GAS
BIOMASS FIRED
OUTPUT: 600 MW
180 BAR
540°C
MANUFCATURER/TYPE: BBC-ABB
YEAR: 2006
ONLY 13,300 AND 45,000 RUNNING HOURS AFTER MAJOR OVERHAULALTERNATOR ACEC TC 1498
COOLING: HYDROGEN 22 KV 3000 TR 1550 KVA
MAIN TRAFO: WESTINGHOUSE 375 MVA 156/22 KV
COUPLE TRAFO: ALSTHOM 20 MVA 22/6.4 KV
START TRAFO: ALSTHOM 20 MVA 71.5/6.4 KVFUELPUMPS: ID:3 / HD:3 LD:2881/HD:2223
16 BURNERS TANGENIALGASBURNERS: TANGENIAL 16 PCS 5000 NM3
COAL GRINDING MILLS:
(4) LOESCHE LM 19.20D
25 T/HR(2) LOESCHE LM 20.20D
35 T/HRBIOMASS POWER GENERATION BY CFB (CIRCULATING FLUIDIZED BED) BOILER 20 MWe FIRED BY WOOD DERIVED WASTES CUT INTO CHIPS. COMPLETE SAWDUST INSTALLATION.
UNIT 1
172,000 HOURS, OVERHAULED IN 2006
NEW ROTOR (HD, MD, LD)
ONLY 13,000 HOURS AFTER OVERHAUL
IN PRODUCTION UNTIL JANUARY 5, 2013
SWAP HD ROTOR IN APRIL 2011 ONLY 408 HOURS UNTIL NOW!UNIT 2
265,000 HOURS, OVERHAULED IN 2006 (HD, MD, LD)
45,000 HOURS AFTER OVERHAUL
IN PRODUCTION UNTIL JANUARY 5, 2013
SWAP HD ROTOR IN NOVEMBER 2011 ONLY 13,300 HOURS UNTIL NOW!
189 KG/CM2, 540˚C, 3000 T/MINPLANT ORIGINALLY FROM THW 1970’S BUT RENEWED IN 2006
STILL INSTALLED
IMMEDIATE DISMANTLING POSSIBLE
BOILER INTAKE CAPACITY: 3500 T/H
NEW PLCQUANTITY: 2
Learn More - K-2582 SIEMENS COAL AND BIOMASS POWER PLANT 2.5MW YEAR 2002
K-2582 SIEMENS COAL AND BIOMASS POWER PLANT 2.5MW YEAR 2002
WAS BUILT TO SUPPLY THE PAPER MILL WITH STEAM AND ELECTRICITY
MAKE: SIEMENS
MODEL: CFR5 G6a
2.5MW
65 BAR
480 ˚ C
REVOLUTION NUMBER: 23000 U PER MINUTE
EVAPORATION PRESSURE: 1-10 BAR
YEAR 2002
THE STEAM TUBINE AND THE GENERATOR WERE CHANGES AND ARE NEW
HOURS: LESS THAN 30,000
BOILER SYSTEM WAS COMPLETELY RECONDITIONED
THE WATER TREATMENT PLANT WAS RECONDITIONED
EXHAUST CLEANING SYSTEM WAS RECONDITIONED
ASH AND COAL TRANSPORTATION SYSTEMS WERE RECONDITIONEDQUANTITY: 1