Search results for: 'gas tu'
-
TT-7050 ROLLS ROYCE GAS TURBINE, 4 MW, YEAR 1999, YEAR 2011, NATURAL GAS, CORE ENGINETT-7050 ROLLS ROYCE GAS TURBINE, 4 MW, YEAR 1999, YEAR 2011, NATURAL GAS, CORE ENGINE 1. YEAR OPERATIONAL PERIOD: 1999 TO 2011 2. TOTAL RUNNING HOURS: 39,500 HOURS 3. BRAND: ROLLS ROYCE - ALLISON 4. TYPE: 501 KB5S-LE4 5. ASSEMBLED/ENCAPSULATED BY: TURBOMECA (FRANCE) 6. ABSORBED POWER (GAS): 13.6 MW 7. FUELS/OXIDIZER: NATURAL GAS AT 19 BAR, AIR (FILTERED) QUANTITY: 1 Learn More -
L-5951 WESTINGHOUSE 100 MW GAS TURBINES, LNG FIRED, 60 Hz, YEAR 1995REFERENCE NUMBER: L-5951
WESTINGHOUSE 100 MW GAS TURBINES, LNG FIRED, 60 Hz, YEAR 1995
GAS TURBINES
MAKE: WESTINGHOUSE
YEAR: 1995 (STOPPED IN JUNE 2013)
100 MW EACH X 6 = 600 MW TOTAL
QUANTITY: 5
Learn More -
YY-3513 SIEMENS SGT-600 GAS TURBINES, 24.5 MW EACH, 1.500 RPM, 9 TURBINESYY-3513 SIEMENS SGT-600 GAS TURBINES, 24.5 MW EACH, 1.500 RPM, 9 TURBINES SIEMENS SGT-600 GAS TURBINES (AS-IS, WHERE-IS BASIS) POWER OUTPUT: 24.5 MW EACH FREQUENCY: 50 Hz VOLTAGE: 11 KV RPM: 1.500 RPM QUANTITY: 9 Learn More -
M-4835 POWER AND INDUSTRIAL PLANTS FOR SALEREFERENCE NUMBER: M-4835 (1111VEHJXX10) L POWER AND INDUSTRIAL PLANTS FOR SALE QTY. OUTPUT (MW) DESCRIPTION MANUFACTURER/ TYPE BUILT/ CONDITION 1 230 COMBINED CYCLE GAS TURBINE POWER PLANT SIEMENS V94-2 1988 1 220 COMBINED CYCLE POWER PLANT 50 HZ, FUEL: DUAL FUEL (NATURAL GAS OR HFO/DIESEL) GE FRAME 6B CCPP 1992, RUNNING HOURS: 135 000, PREUSED 1 180 GAS TURBINE 125 MW, STEAM TURBINE 55 MW, 50 HZ, FUEL LFO AND NG GE FRAME 9E CCPP 2005, RUNNING HOURS: 2000 2 128 COMPLETE POWER PLANTS, 15 KV, FUEL: NATURAL GAS AND LIGHT OIL GE FRAME PG9171E NEW 2 127 GAS TURBINE PACKAGES FIAT AVIO MODEL TG 50 – D5 1998,DISMANTLED, OVERHAULED, UPGRADED FROM SIEMENS AND DISMANTLED 2 125 COMPLETE PLANT, 2 UNITS ABB GAS TURBINE PACKAGES, FUEL: DUAL FUEL, 50 HZ ABB, 50WT 18H-66 1995, JUST OVERHAULED, WARRANTY POSSIBLE 1 93 COMBINED CYCLE POWER PLANT. FUEL : NATURAL GAS GE FRAME 6FA 1997 MAJOR INSPECTION IN 2009 1 73 COMBINED CYCLE POWER PLANT. FUEL: NATURAL GAS. 50 HZ. SIEMENS WESTINGHOUSE AND MITSUBISHI. 1999, RUNNING HOURS 97 000 1 70 COMBINED CYCLE POWER PLANT THOMASSEN/ABB 2009, RUNNING HOURS UNDER 90 000 CONDITION GOOD, 2009 OVERHAULED 5 66 GAS TURBINE PACKAGES, 50 OR 60 HZ ROLLS ROYCE, TRENT 60 2014, RUNNING HOURS ZERO 3 49 GAS TURBINE POWER PLANT, 50 HZ 3 UNITS GE LM 6000 PC 2004, RUNNING HOURS 6000 QTY. OUTPUT (MW) DESCRIPTION MANUFACTURER/ TYPE BUILT/ CONDITION 1 46 COMPLETE PLANT, INCLUDES 5 GAS TURBINE PACKAGES, INCLUDING 1 STEAM TURBINE, BOILER AND AUXILIARIES. FUEL: NATURAL GAS AND NAPHTA. 50 HZ. SIEMENS TYPHOON AND ALSTOM. 2000, LOW HOURS, STILL IN OPERATION 1 42 COMBINED CYCLE POWER PLANT. FUEL: NATURAL GAS. 50 HZ. GE LM 6000PA 1997, LAST HOT END OVERHAUL WAS AT 86.080 HOURS IN AUG 2010 1 41 GAS TURBINE PACKAGE WITH HRSG, 50HZ FUEL: NATURAL GAS/FUEL OIL THOMASSEN PG-6541 1995, LAST OVERHAUL AT 118350 1 40 COMBINED CYCLE POWER PLANT. FUEL: NATURAL GAS AND LIGHT OIL. 50 HZ. GE FRAME 6 B, DRY LOW NOX 1992, RECENTLY OVERHAULED, STILL GOOD FOR MORE THAN 24.000 RUNNING HOURS. READY TO SHIP. 5 37 GAS TURBINE PACKAGES, DUAL FUEL, 50/60 HZ SGT 750 SIEMENS NEW, ZERO HOURS 1 31,2 GAS TURBINE PACKAGES, 31,2 MW , 50/60 HZ, SGT 700 NEW, ZERO HOURS 5 31 GAS TURBINE PACKAGES, DUAL FUEL, 50/60 HZ GE TM2500 NEW 1 29,65 GAS TURBINE GENERATOR, 50 HZ, 11 KV SGT 700 2011, RUNNING HOURS ZERO (NEW) 1 27 COMBINED CYLE POWER PLANT, 27 MW, NATURAL GAS GE RLM 2500 PE AND ALSTOM STEAM TURBINE GAS TURBINE 1994, STEAM TURBINE 1996 1 26,59 GAS TURBINE, FUEL: GAS FRAME 5, PG-5371 PA 1995, RUNNING HOURS 174,104 4 24,6 CORE ENGINE FUEL: NATURAL GAS, 50 HZ SIEMENS SGT 600 (EX ABB GT 10B) 1994-1997, ZERO HOUR OVERHAULED 1 16 GAS TURBINE PACKAGE DUEAL FUEL ROLLS ROYCE AVON 1534-102L ZERO HOUR OVERHAULED IN 2008 1 14,25 NATURAL GAS ENGINE SOLAR TITAN 130 SOLONOX, 50 HZ TURBOMACH T19501 2007, ZERO RUNNING HOURS, AS NEW 3 12,9 GAS TURBINES SIEMENS, 60 HZ SIEMENS SGT 400 2014, NEW NEVER USED 1 11,86 GAS TURBINE, 60 HZ SOLAR MARS 100 15000 SOLONOX 1996, RUNNING HOURS 34 000 SINCE LAST OVERHAUL 2 9,2 CHP PLANT ELECTRIC, NATURAL GAS AND LIGHT DIESEL&BOTH SOLAR CENTAUR 50 T5701 2005 AND 2008, RUNNING HOURS 26 000 AND 2 500 1 8,8 COMBINED CYCLE GAS TURBINE POWER PLANT. 60 HZ. SOLAR MARS 90. 1989, LAST MAJOR OVERHAUL IN 2004, ONLY 1225 RUNNING HOURS 1 7,5 NATURAL GAS ENGINE SOLAR TAURUS T70, 50 HZ TURBOMACH SOLONOX + WHRB 2007, ZERO RUNNING HOURS AS NEW 1 5,5 GAS TURBINE, 50 HZ, NATURAL GAS SGT 200 1989, RUNNING HOURS 126 340 QTY. OUTPUT (MW) DESCRIPTION MANUFACTURER/ TYPE BUILT/ CONDITION 1 5,2 DUAL NATURAL GAS AND OIL ENGINE TAURUS 60, 50 HZ SOLAR TAURUS 60, SOLONOX T7301 1998, RUNNING HOURS17 700 1 1,4 GAS TURBINE PACKAGE INCL. HRSG, 50 HZ KAWASAKI KA 1334 1995, RUNNING HOURS AFTER MAJOR OVERHAUL 4000 Learn More -
TT-6597 MTU OPEN TYPE NATURAL GAS GENERATORS, 1.5 MW, 50Hz EXCELLENT FULL DESCRIPTION OF A GENERATORTT-6597 MTU OPEN TYPE NATURAL GAS GENERATORS, 1.5 MW, 50Hz EXCELLENT FULL DESCRIPTION OF A GENERATOR QUANTITY: 10 Learn More -
YY-3492 NEW SURPLUS SOLAR TAURUS 60 ENCLOSED NATURAL GAS TURBINE GENERATOR SET, YEAR 2022, GAS ONLYYY-3492 NEW SURPLUS SOLAR TAURUS 60 ENCLOSED NATURAL GAS TURBINE GENERATOR SET, YEAR 2022, GAS ONLY QUANTITY: 1 Learn More -
TT-3047 GE FRAME 7EA GAS TURBINE PLANT, WITH HRSG, NATURAL GAS, 60 Hz, 86 MWTT-3047 GE FRAME 7EA GAS TURBINE PLANT, WITH HRSG, NATURAL GAS, 60 Hz, 86 MW QUANTITY: 1 Learn More -
TT-3044 GE FRAME 9 GAS TURBINES, 123 MW, 50 Hz, 10500 VOLT, NATURAL GAS, 28,000 HOURS, YEAR 1997TT-3044 GE FRAME 9 GAS TURBINES, 123 MW, 50 Hz, 10500 VOLT, NATURAL GAS, 28,000 HOURS, YEAR 1997 QUANTITY: 2 Learn More -
TT-3052 LM 2500 PE SAC GAS TURBINES, 22.5 MW OUTPUT, NATURAL GAS, 2400 HOURSTT-3052 LM 2500 PE SAC GAS TURBINES, 22.5 MW OUTPUT, NATURAL GAS, 2400 HOURS QUANTITY: 2 Learn More -
TT-1418 SOLAR TITAN 130 GAS TURBINE, 50Hz / 60Hz, YEAR 2007TT-1418 SOLAR TITAN 130 GAS TURBINE, 50Hz / 60Hz, YEAR 2007 SOLAR TITAN 130 GAS TURBINE 15,000KWE 11,170 RPM / 60Hz 11,197 RPM / 50Hz FUEL GAS QUANTITY: 1 Learn More