Search results for: 'plant and equipment'
- Related search terms
- equipments f
- and gate
- equipment'
- and ma'
- equipment in
-
T-9997 CEMENT AND MUD PLANTST-9997 CEMENT AND MUD PLANTS ITEM 001 CEMENT PLANT FULLY FUNCTIONAL CEMENT PLANT READY TO BE REASSEMBLED ITEM 002 MUD PLANT FUNCTIONAL LIQUID MUD PLANT (LMP) 31,500BBL CAPACITY Learn More -
YY-2424 USED NGR REGRANULATION LINE for BOPP FILM, FLUFF, LUMPS, MDO WASTE 900 TO 1000 KG PER HYY-2424 USED NGR REGRANULATION LINE for BOPP FILM, FLUFF, LUMPS, MDO WASTE 900 TO 1000 KG PER H OVERCONSUMPTION: 500 KW OUTPUT: 1000 KGS PER HOUR INTENDED FOR THE FOLLOWING WASTE: OUTPUT; BOPP FILM, FLUFF, LUMPS, MDO WASTE: 900 TO 1000 KG/H; CPP FILM, FLUFF, LUMPS: 900 TO 1000 KG/H; PERFORMANCE IS PROVIDED FOR REFERENCE ONLY. THE CAPACITY OF THE DEVICE DEPENDS ON THE PROPERTIES OF THE MATERIAL, E.G. MOISTURE CONTENT, PRINTING, WEIGHT, MELT INDEX, CONTAMINATION AND DEGREE OF FILTRATION. AVERAGE POWER CONSUMPTION: 500 KW; AVERAGE COOLING WATER DEMAND: 668 L/MIN; AVERAGE FRESH WATER CONSUMPTION: 34 L/H; MAXIMUM COMPRESSED AIR CONSUMPTION: 100 L/MIN. THE VALUES GIVEN ABOVE ARE ONLY REFERENCE VALUES AND MAY DIFFER FROM THE VALUES FINAL VALUES OBTAINED AFTER CALIBRATION OF THE DEVICE. THIS DATA SHOULD NOT BE USED FOR PLANNING. Learn More -
TT-8656 SIEMENS SGT5 4000 F GAS TURBINE & GENERATOR – NEW, 54 MW, YEAR 2016, 50/60 HzTT-8656 SIEMENS SGT5 4000 F GAS TURBINE & GENERATOR – NEW, 54 MW, YEAR 2016, 50/60 Hz 1. NEW AND UNUSED SIEMENS GAS TURBINE & GENERATOR 2. HEAVY DUTY, SINGLE CASING, AXIAL FLOW DESIGN AND DUAL FUEL GAS TURBINE. 3. MODEL: SGT54000F 4. BRAND: SIEMENS AG 5. 54 MW 6. YEAR OF MANUFACTURE: 2016 7. FREQUENCY: 50 Hz 8. FUEL: NATURAL GAS (NG) AND DIESEL OIL (DO) 9. GUARANTEED PERFORMANCE: 10. GROSS POWER OUTPUT [MW]: 298,2 (NG) – 301 (DO). 11. GROSS HEAT RATE [KJ/KWH]: 8979,3 (NG) – 9538,5 (DO). 12. GENERATOR: SGEN51200 A. 13. INCLUDES: BYPASS STACK AND DIVERTER DAMPER. 14. DELIVERY: IMMEDIATELY. BUYER IS RESPONSIBLE FOR LOADING, FREIGHT AND LOGISTICS FROM ACTUAL LOCATION TO FINAL DESTINATION. 15. DETAILED DESCRIPTION: GAS TURBINE (GT) 16. IT WORKS ON 50 Hz BUT COULD BE CONVERTED, WITH ADDITIONAL EQUIPMENT FOR 60 Hz (EXTRA COSTS). QUANTITY: 1 Learn More -
M-2042 WISCONSIN OVEN GAS FIRED BATCH OVEN FOR TEMPERING MATTRESS INNERSPRINGSREFERENCE NUMBER: M-2042 (770IDFGXX6) WISCONSIN OVEN GAS FIRED BATCH OVEN FOR TEMPERING MATTRESS INNERSPRINGS GAS FIRED BATCH OVEN MANUFACTURER: WISCONSIN OVEN STILL ASSEMBLED TODAY OVEN WILL BE USED FOR TEMPERING STEEL SPRING ASSEMBLIES WITH A LOADING OF APPROXIMATELY 50 ASSEMBLIES WEIGHING APPROXIMATELY 40 POUNDS, IN THE OVEN AT A TIME THE SIZE IS BASED ON APPROXIMATELY 4 TO 5 CYCLES PER HOUR PROVIDING THE LOADING AND UNLOADING IS ACCOMPLISHED PROMPTLY THE HEATING RATE IS BASED ON A HEATING CYCLE OF APPROXIMATELY 12 MINUTES PER CYCLE THE OVEN WILL INCLUDE, BUT NOT BE LIMITED TO, THE DEISNG FEATURES OUTLINED IN OUR SPECIFICATIONS LISTED BELOW FURTHER MODIFICATIONS AND DESIGN CHANGES MAY BE INCORPORATED AT THE FINAL ENGINEERING STAGES TO PRODUCE THE BEST EQUIPMENT POSSIBLE QUANTITY AVAILABLE: 1 Learn More -
J-4722 GE LM6000 PA GAS TURBINE, 42 MW, 50 Hz, DUAL FUEL, 10,500 VOLTSJ-4722 GE LM6000 PA GAS TURBINE, 42 MW, 50 Hz, DUAL FUEL, 10,500 VOLTS MAKE: GE MODEL: LM6000 PA YEAR: 1993 42 MW 50 Hz DUAL FUEL 10,500 VOLTS CONDITION: USED, 12,000 HOURS QUANTITY: 1 Learn More -
K-8158 COAL FIRED STEAM POWER PLANT 330 MW YEAR 1983K-8158 COAL FIRED STEAM POWER PLANT 330 MW YEAR 1983
COAL FIRED STEAM POWER PLANT 330 MW
PLANT FOR RELOCATION
EQUIPMENT AND AUXILIARIES IN EXCELLENT CONDITIONSUMMARY OF MAIN ADVANTAGES:
THE STEAM PLANT IS AVAILABLE NOW AND CAN BE REINSTALLED IN SHORT TIME
POWER AVAILABLE IN SHORT TIME
THE EQUIPMENT IS OFFERED AT ATTRACTIVE CONDITIONS
LOW INVESTMENT COST
THE MAIN EQUIPMENT IS BASED ON STATE OF THE ART DESIGN & EMISSION CONTROL
COMMERCIAL LIFE TIME FOR MANY YEARS TO COME
RELOCATION IN COOPERATION WITH OEM SUPERVISING AND GUARANTEES OVERALL CONCEPTTECHNICAL DATA OF BOILER:
OEM
STEAM OUTPUT DESIGN PRESSURE LIVE STEAM REHEAT TEMP FUEL980 T/H
203 BAR
184 BAR / GRAD CBROWN COAL, APPROXIMATELY 9,000 KJ/KG
HARD COAL POSSIBLE AS WELL (24,000 - 28,000 KJ/KG)CONSUMPTION APPROXIMATELY 280 T/H AT FULL LOAD WITH BROWN COAL
APPROXIMATELY 110 T/H AT FULL LOAD WITH HARD COALGRINDING MILLS: 6
EMISSION SO2 200 MG/NM3 X 200 MG/NM3 ASHES 50 MG/NM3 EXHAUST TEMP 70°C
TECHNICAL DATA STEAM TURBINE:
OEM
OUTPUT
LIVE STEAM: 330/345 MW, 177.5 BAR, 535°CGENERAL REMARKS:
PLANT HAS GONE IN COMMERCIAL OPERATION IN 1983
PLANT AND EQUIPMENT HAS BEEN IN OPERATION BASICALLY DURING THE WINTER PERIOD AND HAS 84,300 HOURS ACCUMULATED ONLY
ALL EQUIPMENT IS IN EXCELLENT CONDITION AND PROFESSIONALLY PRESERVEDENTIRE PLANT WITH ALL AUXILIARIES IS AVAILABLE FOR RELOCATION
SCOPE AND CONDITIONS:
DISASSEMBLED, PACKED, AND SHIPPED OR TURNKEY SOLUTION CAN BE NEGOTIATED
RELOCATION WILL BE INCOORDINATION WITH THE OEM WHO IS WILLING TO GIVE A CERTAIN LEVEL OF GUARANTEE FOR THE RELOCATED PLANTQUANTITY: 1
Learn More -
TT-1886 KAWASAKI PU4000B-ER GAS TURBINE POWER PLANT 51.2MW 60Hz, (16 X 3.2MW), YEAR 2008TT-1886 KAWASAKI PU4000B-ER GAS TURBINE POWER PLANT 51.2MW 60Hz, (16 X 3.2MW), YEAR 2008 KAWASAKI PU4000B-ER GAS TURBINE POWER PLANT 51.2MW 60Hz (16 X 3.2MW) MAIN SPECIFICATIONS GAS TURBINE MODEL: M1T-23 BRAND: KAWASAKI POWER OUTPUT: 3,200KWE FREQUENCY & VOLTAGE: 60Hz & 6600V YEAR OF PRODUCTION: 2008 RUNNING HOURS: ABOUT 60 HOURS FUEL OIL: NATURAL GAS PLANT AUXILIARY EQUIPMENT: 1 SET Learn More -
L-5744 LPG GAS MANUFACTURING PLANT, YEAR 2010 – PROPANE, ISO BUTANE, BUTANE, PENTANEREFERENCE NUMBER: L-5744
LPG GAS MANUFACTURING PLANT, YEAR 2010 – PROPANE, ISO BUTANE, BUTANE, PENTANE
MANUFACTURING YEAR: 2010
CAPACITIES:
LIQUEFACTION EQUIPMENT: 80,000 SM³/DAY
DISTILLATION EQUIPMENT: 65,000 SM³/DAY(120TON/DAY)
PRODUCT : PROPANE, ISO BUTANE, BUTANE, PENTANE
QUANTITY: 1
Learn More -
TT-4529 GENERAL ELECTRIC TURBINE GENERATOR – NEW, NATURAL GAS, 90MW, 60Hz, 7EA + HRSG COGENERATION PLANT, YEAR 2015TT-4529 GENERAL ELECTRIC TURBINE GENERATOR – NEW, NATURAL GAS, 90MW, 60Hz, 7EA + HRSG COGENERATION PLANT, YEAR 2015 EQUIPMENT OVERVIEW NEW / NEVER-USED SURPLUS MANUFACTURED IN 2015 GE 71 EA 91.95 MW NATURAL GAS TURBINE GE 7A6 121000 KVA 60 Hz 13000 V AIR-COOLED GENERATOR COMPLETE WITH ACCESSORY BASE AND ANCILLARY EQUIPMENT OPTIONALLY AVAILABLE HEAT RECOVERY STEAM GENERATOR (HRSG) AND ANCILLARY EQUIPMENT CRATED AND PRESERVED TO OEM SCHEDULE IN CLIMATE CONTROLLED WAREHOUSES Learn More -
K-5045-B CONCRETE BATCHING CEMENT PLANTREFERENCE NUMBER: K-5045-B CONCRETE BATCHING CEMENT PLANT QUANTITY AVAILABLE: 1 Learn More