Search results for: 'oil press'
- Related search terms
- Oil ri
- Oil rig
- oil ref
- Oil well r
- pressure tank
- YY-3556 4 X 60 MW GE LM6000 PD 15PPM SPRINT GAS TURBINE POWER PLANTYY-3556 4 X 60 MW GE LM6000 PD 15PPM SPRINT GAS TURBINE POWER PLANT HISTORY: THE POWER PLANT CONSISTS OF X 50 MW GE LM6000 PD 15PPM SPRINT GAS TURBINE, ALL OF YEAR: 2011, 7000 HRS SINCE NEW EACH, 3000 RPM, 50 Hz, X 13 MW SIEMENS SST 300 STEAM TURBINE WITH 5000 HOURS EACH. PLANT WAS COMMISSIONED AND PUT INTO OPERATION IN 2012. QUNATITY: 1 Learn More
- TT-1744 WARTSILA 18V32 HFO GENERATOR, 6MW, 50Hz, 6.6KVTT-1744 WARTSILA 18V32 HFO GENERATOR, 6MW, 50Hz, 6.6KV WARTSILA 18V32 HFO GENERATOR 6MW HOURS: 4175H, 3784H ALTERNATORS: JYOTI LTD, LEROY SOMER 50Hz 6.6KV QUANTITY: 2 Learn More
- V-2151 AUTEFA, FULLY AUTOMATIC BALING PRESS MODEL LIFT BOX 1500 ADW (DOUBLE ROTATING LIFT BOXES) WITH FULLY AUTOMATIC STRAPPING AND FILM WRAPPING, YEAR 2011 – 45 BALES PER HOUR, BALE WEIGHT: 250KGS – VIDEOS AVAILABLE – NOW FULLY OPERATIONALV-2151 AUTEFA, FULLY AUTOMATIC BALING PRESS MODEL LIFT BOX 1500 ADW (DOUBLE ROTATING LIFT BOXES) WITH FULLY AUTOMATIC STRAPPING AND FILM WRAPPING, YEAR 2011 – 45 BALES PER HOUR, BALE WEIGHT: 250KGS – VIDEOS AVAILABLE – NOW FULLY OPERATIONAL – PERFECT CONDITION SHIPPING: • 3 TO 4 (40FT) CONTAINERS • OVERALL SHIPPING WEIGHT: 25 TONS (APPROXIMATELY) Learn More
- F-1227 EPS BLOCK (6000×1200×600mm) PRODUCTIONREFERENCE NUMBER: F-1227 EPS BLOCK (6000×1200×600mm) PRODUCTION LINE (NEW) CONSIST OF: 1. EPS BATCH PRE-EXPANDER MODEL SJ1400 2. EPS AUTO AIR-COOLING BLOCK MOLDING MACHINE SB6000 3. EPS CUTTING MACHINE PSC6000 4. CNC CUTTING MACHINE SCS3000 5. AUTO SHAPE MOLDING MACHINE WITH VACUUM SZ-172 6. AUXILIARY EQUIPMENT QUANTITY AVAILABLE: 1 Learn More
- TT-8253 MWM 2032V16, 4.2 MW EACH, NATURAL GAS, YEAR 2009, 50HzTT-8253 MWM 2032V16, 4.2 MW EACH, NATURAL GAS, YEAR 2009, 50Hz 1. BRAND: MWM 2. MODEL: 2032V16 3. FUEL: NATURAL GAS 4. YEAR OF CONSTRUCTION: 2009 5. OPERATING HOURS: 41,600 (AVERAGE) 6. MAJOR OVERHAUL E60: 2015 (AT AVERAGE 33.600 HOURS) 7. MOTHBALLED: 2019 8. ALTERNATOR: AVK 9. FREQUENCY: 50Hz 10. VOLTAGE: 11 KV QUANTITY: 14 Learn More
- YY-3442 TRIVENI TC 145, YEAR 2009, 10 MW FULL CONDENSING STEAM TURBINE GENERATOR SET WITH TD POWER SYSTEMS 12500 KVA GENERATOR, 50 Hz, COMPLETE WITH GEARBOX AND ACCESSORIESYY-3442 TRIVENI TC 145, YEAR 2009, 10 MW FULL CONDENSING STEAM TURBINE GENERATOR SET WITH TD POWER SYSTEMS 12500 KVA GENERATOR, 50 Hz, COMPLETE WITH GEARBOX AND ACCESSORIES DETAILS: TRIVENI TC 145, YEAR 2009, 10 MW FULL CONDENSING STEAM TURBINE GENERATOR SET WITH TD POWER SYSTEMS 12500 KVA GENERATOR, 50 Hz, COMPLETE WITH GEARBOX AND ACCESSORIES. TURBINE DETAILS 1. MANUFACTURER: TRIVENI TURBINE BUSINESS GROUP 2. MODEL: FULL CONDENSING TURBINE 3. POWER: 10 MW 4. YEAR OF MANUFACTURE: 2009 5. LOCATION: INDIA Learn More
- YY-2535 GE LM6000PA 42+7MW CHP PLANTYY-2535 GE LM6000PA 42+7MW CHP PLANT THE EXTENSIVE LIST OF ACCOMPANYING EQUIPMENT INCLUDES: 1. GE LM6000PA GAS TURBINE EQUIPPED WITH WATER INJECTION, PAIRED WITH A BRUSH ALTERNATOR WITH 42 MW OUTPUT CAPACITY. THIS GAS TURBINE SUPPORTS NATURAL GAS OR DISTILLATE FUEL. 2. GT MK V CONTROL UNIT WITH AUXILIARY SYSTEMS. 3. SIEMENS BACK PRESSURE STEAM TURBINE WITH 7MW OUTPUT CAPACITY. 4. NOOTER ERIKSON HRSG CAPABLE OF SUPPLEMENTARY FIRING WITH NATURAL GAS OR DISTILLATE FUEL. 5. DUAL BELLIS AND MORCOM THREE-STAGE RECIPROCATING NATURAL GAS COMPRESSORS. 6. WATER TREATMENT PLANT COMPOSED OF TWIN BED RESIN EXCHANGE UNITS AND MIXED BED UNITS. 7. MASSIVE STORAGE TANKS FOR DISTILLATE OIL AND HEAVY FUEL OIL, COMPLETE WITH NECESSARY PIPING AND PUMPS. 8. TWO 11/132 KV TRANSFORMERS RATED AT 40 MVA EACH. 9. STANDBY DIESEL GENERATOR FOR BACKUP POWER. 10. SERCK DISTRIBUTED CONTROL SYSTEM (DCS) FOR INTEGRATED CONTROL AND MONITORING. 11. THREE CONTROL AND GENERAL SERVICE AIR COMPRESSORS. 12. AN EXTENSIVE FIRE DETECTION AND SUPPRESSION SYSTEM, SECURITY CAMERAS, AND GAS DETECTION SYSTEM FOR SAFETY AND SECURITY. 13. A CBISS CONTINUOUS EMISSIONS MONITORING SYSTEM (CEMS) TO ENSURE ADHERENCE TO ENVIRONMENTAL STANDARDS. ALL THE NECESSARY CABLING, TRANSFORMERS, SWITCHGEAR, AND PRESSURE-REDUCING STATIONS ASSOCIATED WITH THE ABOVE-MENTIONED PLANT ARE INCLUDED. A BONUS OF UNIQUE SPARE PARTS, EXTENSIVE MANUALS, RECORDS, AND DRAWINGS ARE ALSO PART OF THE PACKAGE, ENSURING SMOOTH OPERATION AND MAINTENANCE. A GE LM6000PA CHP PLANT REPRESENTS A ROBUST, EFFICIENT SOLUTION TO YOUR POWER AND HEATING NEEDS, OFFERING THE RELIABILITY AND FLEXIBILITY NEEDED FOR YOUR OPERATIONS. QUANTITY: 1 UNIT AVAILABLE FOR PURCHASE Learn More
- YY-3325 REFURBISHED SCHRAMM T450HYY-3325 REFURBISHED SCHRAMM T450H CAT 3406 DECK ENGINE 900/350 AIR END DUMP MAST RC SETUP QUANTITY: 1 Learn More
- TT-1886 KAWASAKI PU4000B-ER GAS TURBINE POWER PLANT 51.2MW 60Hz, (16 X 3.2MW), YEAR 2008TT-1886 KAWASAKI PU4000B-ER GAS TURBINE POWER PLANT 51.2MW 60Hz, (16 X 3.2MW), YEAR 2008 KAWASAKI PU4000B-ER GAS TURBINE POWER PLANT 51.2MW 60Hz (16 X 3.2MW) MAIN SPECIFICATIONS GAS TURBINE MODEL: M1T-23 BRAND: KAWASAKI POWER OUTPUT: 3,200KWE FREQUENCY & VOLTAGE: 60Hz & 6600V YEAR OF PRODUCTION: 2008 RUNNING HOURS: ABOUT 60 HOURS FUEL OIL: NATURAL GAS PLANT AUXILIARY EQUIPMENT: 1 SET Learn More
- YY-1521COMPUTERIZED SINGLE HEAD QUILTING MACHINEYY-1521COMPUTERIZED SINGLE HEAD QUILTING MACHINE QUANTITY: 1 Learn More