Search results for: 'gas po'
-
K-8177 GAS TURBINES, COMBINED CYCLE POWER PLANTS, DIESEL & GAS ENGINESK-8177 GAS TURBINES, COMBINED CYCLE POWER PLANTS, DIESEL & GAS ENGINES
Learn More -
TT-8654 SIEMENS SGT 5/6-2000E (94.2) POWER GENERATION, 498 MW, GAS FIRED, 60 HzTT-8654 SIEMENS SGT 5/6-2000E (94.2) POWER GENERATION, 498 MW, GAS FIRED, 60 Hz 1. POWER GENERATION 498 MW TOTAL 2. GAS FIRED 3. FREQUENCY (60 Hz) 4. MODEL: SIEMENS SGT5/6-2000E (VERSION 94.2) 5. OUTPUT: 166 MW PER UNIT (BASE LOAD) 6. CONFIGURATION: SIMPLE CYCLE; CONVERTIBLE TO COMBINED CYCLE OR CHP 7. FUEL: NATURAL GAS (OTHER FUELS POSSIBLE WITH MODIFICATION) 8. CONDITION: BRAND NEW, NEVER USED, ZERO HOURS 9. SERVICEABILITY: FULL SIEMENS OEM SUPPORT, GLOBAL SPARES AVAILABILITY, ROBUST INSTALLED BASE (SEPARATELY QUOTED SERVICE) QUANTITY: 3 Learn More -
M-5321 JENBACHER NATURAL GAS POWERPLANT 21.6 MW YEAR 1998REFERENCE NUMBER: M-5321 (22011DGFAB1RXL) L JENBACHER NATURAL GAS POWERPLANT 21.6 MW YEAR 1998 COMPLETE JENBACHER NATURAL GAS POWERPLANT OF 21.6 MW YEAR OF MANUFACTURE END OF 1998 COMMISSIONING: 5 UNITS IN 2000, 1 UNIT IN 2009, 1 UNIT IN 2010, AND 1 UNIT IN 2011 8 UNITS JENBACHER JMS 620 G OF 2.7 MWE-TOTAL EFFECTIVE ELECTRIC OUTPUT 21.7 MW RUNNING HOURS: 5 UNITS BETWEEN 38,000 AND 40,000 HOURS, 2 UNITS 6,200 HOURS AND 1 UNIT 7,200 HOURS JENBACHER MAINTENANCE FULL MAINTENANCE HISTORY QUANTITY AVAILABLE: 1 Learn More -
K-2547 GAS TURBINE POWER PLANT 5.2MW YEAR 1989K-2547 GAS TURBINE POWER PLANT 5.2MW YEAR 1989
SOLAR TAURUS 6- SOLO NOx
5.2MW
YEAR 1989- GAS TURBINE RECONDITIONED IN 2010
STEAM BOILER
25 T/H/ 16-25 BAR AND GAS COMPRESSORS
NATURAL GAS
50 HZQUANTITY: 1
Learn More -
JENBACHER LMS612GS GAS POWER PLANT, 2 MW, 50 Hz, YEAR 2011REFERENCE NUMBER: T-6935 JENBACHER LMS612GS GAS POWER PLANT, 2 MW, 50 Hz, YEAR 2011 JENBACHER LMS612GS GAS POWER PLANT COMPLETE POWER PLANT 2,000 KW COP 11,000 V, 50 Hz AVK ALTERNATOR 1,500 RPM RADIATOR, SILENCER, EXHAUST, GAS CONTROL LINE YEAR 2011 APPROX 230 H ONLY QUANTITY: 1 Learn More -
ALSTOM GAS POWER PLANT, 252 MWREFERENCE NUMBER: T-6937 ALSTOM GAS POWER PLANT, 252 MW ALSTOM GAS POWER PLANT 252 MW WITH SIEMENS TECHNOLOGY STILL INSTALLED, USED ONLY TEST AND MAINTENANCE OPERATION 500 HOURS QUANTITY: 1 Learn More -
K-2560 ROLLS ROYCE NATURAL GAS FUEL COMPLETE POWER PLANT 2.0MW YEAR 1993K-2560 ROLLS ROYCE NATURAL GAS FUEL COMPLETE POWER PLANT 2.0MW YEAR 1993
2.0MW
11KV
NATURAL GAS FUEL
YEAR 1993 LOW HOURS
50 HZQUANTITY: 1
Learn More -
K-2557 MWM NATURAL GAS FUEL COMPLETE POWER PLANT 3.88MW YEAR 2008 TO 2009-NEWK-2557 MWM NATURAL GAS FUEL COMPLETE POWER PLANT 3.88MW YEAR 2008 TO 2009-NEW
3.88MW
11KV
YEAR 2008 TO 2009
50 HZQUANTITY: 9
Learn More -
K-8157 COAL FIRED POWER PLANT (2 X 50MW)K-8157 COAL FIRED POWER PLANT (2 X 50MW)
ENERGY BOILERS (CAE)
TURBINE SYSTEMS
STEAM TURBINES (TA) - DSL ARE 50 - 1
-CONDENSING TURBINE WITH TWO ADJUSTABLE OUTLETS, SUCH AS "ACTING" ON A SINGLE LINE OF TREES, DESIGNED TO DRIVE THE AC GENERATOR DIRECT-TYPE TH 60-2
-IS COMPOSED OF TWO BODIES: THE BODY OF HIGH PRESSURE (CIP) AND MEDIUM AND LOW PRESSURE BODY (CMP + CJP)
-HAS TWO ADJUSTABLE OUTLETS (PLUG SOCKETS AND PLUG HEATING) AND FIVE FIXED DOSES REGENERATIVE CIRCUIT FEEDSQUARES OF 600 CARS OVER T/H (WITH BUCKET WHEEL AND ARM LENGTH 12 M) - 4 PCS
-TIP HAMMER CRUSHERS CCA - 160 TO 2 PIECES
- RUBBER BANDS COAL TRANSPORTTHE MAIN EQUIPMENT IS ADDED TO ENSURE PROPER OPERATION FOLLOWING:
- SOLID FUEL STORAGE
- INSTALLATIONS AND INDUSTRIAL WATER SUPPLIES AND WASTEWATER DISCHARGE
- INSTALLATION OF EXHAUST HYDRAULIC SLAG
- WATER TREATMENT STATION
TO USE COAL, WEIGHT 88%, 12% NATURAL GASQUANTITY: 1
Learn More -
L-5951 WESTINGHOUSE 100 MW GAS TURBINES, LNG FIRED, 60 Hz, YEAR 1995REFERENCE NUMBER: L-5951
WESTINGHOUSE 100 MW GAS TURBINES, LNG FIRED, 60 Hz, YEAR 1995
GAS TURBINES
MAKE: WESTINGHOUSE
YEAR: 1995 (STOPPED IN JUNE 2013)
100 MW EACH X 6 = 600 MW TOTAL
QUANTITY: 5
Learn More