Search results for: 'turbine generator plant'
- Related search terms
- Generator
- generator new
- generator 3.8
- Generator power pla
- generator 60
-
J-4722 GE LM6000 PA GAS TURBINE, 42 MW, 50 Hz, DUAL FUEL, 10,500 VOLTSJ-4722 GE LM6000 PA GAS TURBINE, 42 MW, 50 Hz, DUAL FUEL, 10,500 VOLTS MAKE: GE MODEL: LM6000 PA YEAR: 1993 42 MW 50 Hz DUAL FUEL 10,500 VOLTS CONDITION: USED, 12,000 HOURS QUANTITY: 1 Learn More -
TT-1885 MITSUI-ALSTOM STEAM TURBINE PLANT, 97.5MW 60HzTT-1885 MITSUI-ALSTOM STEAM TURBINE PLANT, 97.5MW 60Hz MITSUI-ALSTOM STEAM TURBINE PLANT NEVER-USED 13800V 97.5MW 60Hz AVAILABILITY IMMEDIATELY AVAILABLE QUANTITY: 1 Learn More -
YY-3241 SIEMENS SGT 400 GAS TURBINE, 12.9 MW, 11 KV, NATURAL GAS, YEAR 2017, 50 HzYY-3241 SIEMENS SGT 400 GAS TURBINE, 12.9 MW, 11 KV, NATURAL GAS, YEAR 2017, 50 Hz MW: 12.9 VOLTAGE: 11 KV FUEL TYPE: NATURAL GAS YEAR: 2017 50 Hz QUANTITY: 1 Learn More -
TT-1508 SIEMENS SGT-800 GENERATOR SET, 50 Hz, 47.5 MWTT-1508 SIEMENS SGT-800 GENERATOR SET, 50 Hz, 47.5 MW GAS TURBINE GENERATOR PLANT THIS USED SGT GENSET HAS FORMERLY BEEN USED BY A PAPER FACTORY AND HAS BEEN PROFESSIONALLY DISMANTLED AND PACKED BY THE ORIGINAL MANUFACTURER SIEMENS IN MARCH 2022. QUANTITY: 2 SETS Learn More -
TT-6361 SIEMENS SGT 400 POWER PLANT – NEW, 12.9 MW, YEAR 2017, 50HzTT-6361 SIEMENS SGT 400 POWER PLANT – NEW, 12.9 MW, YEAR 2017, 50Hz 1. BRAND: SIEMENS TURBINES 2. MODEL: SIEMENS SGT400 3. CONDITION: NEW 4. YEAR: 2017 Learn More -
TT-7587 SIEMENS TG50D5/W701DS GAS TURBINE GENERATOR, 127.8 MW, YEAR 1995TT-7587 SIEMENS TG50D5/W701DS GAS TURBINE GENERATOR, 127.8 MW, YEAR 1995 1. SIEMENS WESTINGHOUSE TG50D5/W701DS 127.8 MW GAS TURBINE GENERATOR PACKAGES FOR SALE. THE TURBINE PACKAGES TOGETHER OFFER 255 MW READY TO SHIP EQUIPMENT. THIS TECHNOLOGY IS ONE OF THE MOST WIDESPREAD MIDDLE SIZE ENGINES (100-104 MW) FOR POWER GENERATION AND THE ONLY TURBINE OF ITS SIZE THAT CAN OPERATE ON HEAVY FUEL OIL (HFO). 2. THE UNITS ARE OFFERED WITH SOME OF THE REQUIRED BALANCE OF PLANT BY SEPARATE NEGOTIATION. 3. THESE UNITS WERE INSTALLED AND OPERATED IN A POWER STATION FROM 1996 UNTIL THE END OF 2004, WHEN THEY WERE DISMANTLED AS THE RESULT OF A PLANT UPGRADE. THE UNITS WERE PURCHASED AND UPGRADED BY THE BUYER TO 127.8 MW NOMINAL CAPACITY EACH. THEY ALSO FULLY REFURBISHED THE UNITS TO ZERO HOURS. THE TURBINES HAVE THE CAPABILITY OF BEING ABLE TO SWITCH BETWEEN NATURAL GAS AND LIQUID FUEL WHILE STILL OPERATING UNDER LOAD. QUANTITY: 2 Learn More -
TT-8656 SIEMENS SGT5 4000 F GAS TURBINE & GENERATOR – NEW, 54 MW, YEAR 2016, 50/60 HzTT-8656 SIEMENS SGT5 4000 F GAS TURBINE & GENERATOR – NEW, 54 MW, YEAR 2016, 50/60 Hz 1. NEW AND UNUSED SIEMENS GAS TURBINE & GENERATOR 2. HEAVY DUTY, SINGLE CASING, AXIAL FLOW DESIGN AND DUAL FUEL GAS TURBINE. 3. MODEL: SGT54000F 4. BRAND: SIEMENS AG 5. 54 MW 6. YEAR OF MANUFACTURE: 2016 7. FREQUENCY: 50 Hz 8. FUEL: NATURAL GAS (NG) AND DIESEL OIL (DO) 9. GUARANTEED PERFORMANCE: 10. GROSS POWER OUTPUT [MW]: 298,2 (NG) – 301 (DO). 11. GROSS HEAT RATE [KJ/KWH]: 8979,3 (NG) – 9538,5 (DO). 12. GENERATOR: SGEN51200 A. 13. INCLUDES: BYPASS STACK AND DIVERTER DAMPER. 14. DELIVERY: IMMEDIATELY. BUYER IS RESPONSIBLE FOR LOADING, FREIGHT AND LOGISTICS FROM ACTUAL LOCATION TO FINAL DESTINATION. 15. DETAILED DESCRIPTION: GAS TURBINE (GT) 16. IT WORKS ON 50 Hz BUT COULD BE CONVERTED, WITH ADDITIONAL EQUIPMENT FOR 60 Hz (EXTRA COSTS). QUANTITY: 1 Learn More -
YY-2535 GE LM6000PA 42+7MW CHP PLANTYY-2535 GE LM6000PA 42+7MW CHP PLANT THE EXTENSIVE LIST OF ACCOMPANYING EQUIPMENT INCLUDES: 1. GE LM6000PA GAS TURBINE EQUIPPED WITH WATER INJECTION, PAIRED WITH A BRUSH ALTERNATOR WITH 42 MW OUTPUT CAPACITY. THIS GAS TURBINE SUPPORTS NATURAL GAS OR DISTILLATE FUEL. 2. GT MK V CONTROL UNIT WITH AUXILIARY SYSTEMS. 3. SIEMENS BACK PRESSURE STEAM TURBINE WITH 7MW OUTPUT CAPACITY. 4. NOOTER ERIKSON HRSG CAPABLE OF SUPPLEMENTARY FIRING WITH NATURAL GAS OR DISTILLATE FUEL. 5. DUAL BELLIS AND MORCOM THREE-STAGE RECIPROCATING NATURAL GAS COMPRESSORS. 6. WATER TREATMENT PLANT COMPOSED OF TWIN BED RESIN EXCHANGE UNITS AND MIXED BED UNITS. 7. MASSIVE STORAGE TANKS FOR DISTILLATE OIL AND HEAVY FUEL OIL, COMPLETE WITH NECESSARY PIPING AND PUMPS. 8. TWO 11/132 KV TRANSFORMERS RATED AT 40 MVA EACH. 9. STANDBY DIESEL GENERATOR FOR BACKUP POWER. 10. SERCK DISTRIBUTED CONTROL SYSTEM (DCS) FOR INTEGRATED CONTROL AND MONITORING. 11. THREE CONTROL AND GENERAL SERVICE AIR COMPRESSORS. 12. AN EXTENSIVE FIRE DETECTION AND SUPPRESSION SYSTEM, SECURITY CAMERAS, AND GAS DETECTION SYSTEM FOR SAFETY AND SECURITY. 13. A CBISS CONTINUOUS EMISSIONS MONITORING SYSTEM (CEMS) TO ENSURE ADHERENCE TO ENVIRONMENTAL STANDARDS. ALL THE NECESSARY CABLING, TRANSFORMERS, SWITCHGEAR, AND PRESSURE-REDUCING STATIONS ASSOCIATED WITH THE ABOVE-MENTIONED PLANT ARE INCLUDED. A BONUS OF UNIQUE SPARE PARTS, EXTENSIVE MANUALS, RECORDS, AND DRAWINGS ARE ALSO PART OF THE PACKAGE, ENSURING SMOOTH OPERATION AND MAINTENANCE. A GE LM6000PA CHP PLANT REPRESENTS A ROBUST, EFFICIENT SOLUTION TO YOUR POWER AND HEATING NEEDS, OFFERING THE RELIABILITY AND FLEXIBILITY NEEDED FOR YOUR OPERATIONS. QUANTITY: 1 UNIT AVAILABLE FOR PURCHASE Learn More -
YY-3556 4 X 60 MW GE LM6000 PD 15PPM SPRINT GAS TURBINE POWER PLANTYY-3556 4 X 60 MW GE LM6000 PD 15PPM SPRINT GAS TURBINE POWER PLANT HISTORY: THE POWER PLANT CONSISTS OF X 50 MW GE LM6000 PD 15PPM SPRINT GAS TURBINE, ALL OF YEAR: 2011, 7000 HRS SINCE NEW EACH, 3000 RPM, 50 Hz, X 13 MW SIEMENS SST 300 STEAM TURBINE WITH 5000 HOURS EACH. PLANT WAS COMMISSIONED AND PUT INTO OPERATION IN 2012. QUNATITY: 1 Learn More -
K-8157 COAL FIRED POWER PLANT (2 X 50MW)K-8157 COAL FIRED POWER PLANT (2 X 50MW)
ENERGY BOILERS (CAE)
TURBINE SYSTEMS
STEAM TURBINES (TA) - DSL ARE 50 - 1
-CONDENSING TURBINE WITH TWO ADJUSTABLE OUTLETS, SUCH AS "ACTING" ON A SINGLE LINE OF TREES, DESIGNED TO DRIVE THE AC GENERATOR DIRECT-TYPE TH 60-2
-IS COMPOSED OF TWO BODIES: THE BODY OF HIGH PRESSURE (CIP) AND MEDIUM AND LOW PRESSURE BODY (CMP + CJP)
-HAS TWO ADJUSTABLE OUTLETS (PLUG SOCKETS AND PLUG HEATING) AND FIVE FIXED DOSES REGENERATIVE CIRCUIT FEEDSQUARES OF 600 CARS OVER T/H (WITH BUCKET WHEEL AND ARM LENGTH 12 M) - 4 PCS
-TIP HAMMER CRUSHERS CCA - 160 TO 2 PIECES
- RUBBER BANDS COAL TRANSPORTTHE MAIN EQUIPMENT IS ADDED TO ENSURE PROPER OPERATION FOLLOWING:
- SOLID FUEL STORAGE
- INSTALLATIONS AND INDUSTRIAL WATER SUPPLIES AND WASTEWATER DISCHARGE
- INSTALLATION OF EXHAUST HYDRAULIC SLAG
- WATER TREATMENT STATION
TO USE COAL, WEIGHT 88%, 12% NATURAL GASQUANTITY: 1
Learn More