Search results for: 'dual fuel gas tur'
-
YY-2960 TM2500 & TM2500+ MOBILE GAS TURBINE GENERATORYY-2960 TM2500 & TM2500+ MOBILE GAS TURBINE GENERATOR TYPE OF FUEL: DUAL FUEL RUNNING TIME THAT THE TURBINE HAS MADE: LESS THAN 6000HRS Learn More -
TT-4060-B GENERAL ELECTRIC LM2500 SAC COMPLETE POWER PLANT, 22MW, YEAR 2022, 5000 HOURS, 50HzTT-4060-B GENERAL ELECTRIC LM2500 SAC COMPLETE POWER PLANT, 22MW, YEAR 2022, 5000 HOURS, 50Hz WE OFFER TWO TURBINES AND GENERATOR ALONE OR THE TURBINE ALONE, GENERATION 2 QUANTITY: 2 Learn More -
TT-8276 SIEMENS SGT-800 TURBINES, 220 MW, YEAR 2025, 50/60 Hz (55MW each unit x 4) - NEWTT-8276 SIEMENS SGT-800 TURBINES, 220 MW, YEAR 2025, 50/60 Hz (55MW each unit x 4) - NEW 1. POWER GENERATION 220 MW 2. DUAL FUEL (NATURAL GAS / DIESEL) 3. DUAL FREQUENCY (60 Hz/ 50Hz) 4. SIEMENS SGT-800 TURBINES 5. YEAR OF MANUFACTURE: 2025 QUANTITY: 4 UNITS Learn More -
The TM 2500 Mobile Gas Turbine GeneratorThe TM 2500 Mobile Gas Turbine Generator Standard Description Quantity: 2 Units Available Immediately. Learn More -
YY-2654 SIMPLE CYCLED SGT600 GAS TURBINE POWER PLANT, 7 UNITSYY-2654 SIMPLE CYCLED SGT600 GAS TURBINE POWER PLANT, 7 UNITS BRAND NEW FROM 2021/2022 POWER OUTPUT 24.5 MW FUEL: DUAL FUEL ( NATURAL GAS AND LIQUID FUEL) FREQUENCY: 50/60 Hz ASK FOR MORE DETAILS! Learn More -
YY-2894 NEW SIEMENS SGT 400, YEAR 2018YY-2894 NEW SIEMENS SGT 400, YEAR 2018 SIEMENS SGT 400 (12.9 MW) GAS TURBINE · 11-STAGE COMPRESSOR, 6 COMBUSTION CHAMBERS, 2-STAGE POWER TURBINE · GAS FUEL SYSTEM · DLE COMBUSTION SYSTEM · HOT-END DRIVE · 2-SHAFT ENGINE · LEFT-HAND EXHAUST · MAIN LUBRICATION PUMP · EQUIVALENT OPERATING HOURS : 0H · TOTAL STARTS : 0 · NEW, NEVER INSTALLED OR COMMISSIONED QUANTITY: 1 Learn More -
TT-3707 SGT600 OPEN CYCLE GENERATOR SET, 25 MW OUTPUT, 50Hz, YEAR 2002, DUAL FUELTT-3707 SGT600 OPEN CYCLE GENERATOR SET, 25 MW OUTPUT, 50Hz, YEAR 2002, DUAL FUEL SGT600 OPEN CYCLE GENERATOR SET USED 25 MW OUTPUT 50Hz OPERATION QUANTITY: 1 Learn More -
YY-3262 SOLAR T60 GAS TURBINES, YEAR 2008, POWER AT ISO CONDITION 5513KW, VOLTAGE 10.5KV, FREQUENCY 50Hz, 3 SETSYY-3262 SOLAR T60 GAS TURBINES, YEAR 2008, POWER AT ISO CONDITION 5513KW, VOLTAGE 10.5KV, FREQUENCY 50Hz, 3 SETS THE 3 SETS OF SOLAR T60 GAS TURBINES WERE DELIVERED IN 2008 BY SOLAR TURBINES, THEY ARE DUAL FUEL TURBINES WITH DIESEL + COG, USED FOR POWER GENERATION. THE TURBINES WENT OUT OF SERVICE IN 2023 DUE TO ENERGY RESTRUCTURE, AND HAVE BEEN IDLE SINCE THEN. QUANTITY: 3 SETS Learn More -
YY-2311 GE TM2500+ GENERATION 6 GENERATOR PACKAGE – 26 MW EACH, 11,000 V, 50/60 Hz, DIESEL OR NATURAL GAS, YEAR 2011YY-2311 GE TM2500+ GENERATION 6 GENERATOR PACKAGE – 26 MW EACH, 11,000 V, 50/60 Hz, DIESEL OR NATURAL GAS, YEAR 2011 -AT 50 Hz THE UNITS ARE DESIGNED TO PRODUCE 26 MW OF POWER -AT 60 Hz THE UNITS ARE DESIGNED TO PRODUCE 30 MW OF POWER -DEPENDING ON LOCATION TEMPERATURE -THESE ARE CONTINUOUS POWER UNITS DETAILS: 1. 31MW CONTINUOUS RATED (GE ADVERTISED AT ISO CONDITIONS); 2. YEAR OF MANUFACTURE: 2011; 3. PACKAGE SN: 2011-TM006 AND 2011-TM008; 4. CURRENTLY CONFIGURED AS 11KV 50HZ, YET CAN OPERATE AT EITHER 50HZ OR 60HZ; 5. 2 UNITS AVAILABLE; 6. EQUIPMENT IS CONFIGURED TO OPERATE ON LIQUID FUEL OR NATURAL GAS; 7. CURRENT OPERATING HOURS AS OF JULY 30, 2022: TM006 – 1726 HOURS TM008 – 2174 HOURS; 8. HOURS REFLECT TOTAL TIME SINCE NEW: HOURS MAY GO UP AS UNITS ARE STILL CONNECTED FOR EMERGENCY USE ONLY. 9. PRICE INCLUDES THE GT1 REPAIRS RECOMMENDED BY GE IN THE ATTACHED INVESTIGATIVE REPORT; 10. HPT REPLACEMENT ON GT1 ONLY: - LEAD TIME FOR REPAIRS IS 12-14 WEEKS BASED ON CURRENT AVAILABILITY (SUBJECT TO CHANGE); - SCOPE OF SUPPLY FOR EACH UNIT IS LISTED IN APPENDIX A. Learn More -
TT-6896 SIEMENS GAS TURBINE TWIN SHAFT / DUAL SGT600 DLE, 50Hz/60Hz, YEAR 2011TT-6896 SIEMENS GAS TURBINE TWIN SHAFT / DUAL SGT600 DLE, 50Hz/60Hz, YEAR 2011 1. SIEMENS GAS TURBINE TWIN SHAFT / DUAL 2. MODEL: SGT600 DLE 3. EMISSION TYPE: DLE (DRY LOW EMISSION) 4. MADE IN SWEDEN 5. YEAR: 2011 Learn More