TT-6361 SIEMENS SGT 400 POWER PLANT – NEW, 12.9 MW, YEAR 2017, 50HzTT-6361 SIEMENS SGT 400 POWER PLANT – NEW, 12.9 MW, YEAR 2017, 50Hz 1. BRAND: SIEMENS TURBINES 2. MODEL: SIEMENS SGT400 3. CONDITION: NEW 4. YEAR: 2017 Learn More -
TT-8656 SIEMENS SGT5 4000 F GAS TURBINE & GENERATOR – NEW, 54 MW, YEAR 2016, 50/60 HzTT-8656 SIEMENS SGT5 4000 F GAS TURBINE & GENERATOR – NEW, 54 MW, YEAR 2016, 50/60 Hz 1. NEW AND UNUSED SIEMENS GAS TURBINE & GENERATOR 2. HEAVY DUTY, SINGLE CASING, AXIAL FLOW DESIGN AND DUAL FUEL GAS TURBINE. 3. MODEL: SGT54000F 4. BRAND: SIEMENS AG 5. 54 MW 6. YEAR OF MANUFACTURE: 2016 7. FREQUENCY: 50 Hz 8. FUEL: NATURAL GAS (NG) AND DIESEL OIL (DO) 9. GUARANTEED PERFORMANCE: 10. GROSS POWER OUTPUT [MW]: 298,2 (NG) – 301 (DO). 11. GROSS HEAT RATE [KJ/KWH]: 8979,3 (NG) – 9538,5 (DO). 12. GENERATOR: SGEN51200 A. 13. INCLUDES: BYPASS STACK AND DIVERTER DAMPER. 14. DELIVERY: IMMEDIATELY. BUYER IS RESPONSIBLE FOR LOADING, FREIGHT AND LOGISTICS FROM ACTUAL LOCATION TO FINAL DESTINATION. 15. DETAILED DESCRIPTION: GAS TURBINE (GT) 16. IT WORKS ON 50 Hz BUT COULD BE CONVERTED, WITH ADDITIONAL EQUIPMENT FOR 60 Hz (EXTRA COSTS). QUANTITY: 1 Learn More -
TT-1698 TOSHIBA DUAL FUEL INLET STEAM TURBINE & GENERATOR POWER PLANT (NEVER USED), 215 MW, 50 Hz, YEAR 2008TT-1698 TOSHIBA DUAL FUEL INLET STEAM TURBINE & GENERATOR POWER PLANT (NEVER USED), 215 MW, 50 Hz, YEAR 2008 RATING: 215 MW TYPE: STEAM TURBINE & GENSET BRAND: TOSHIBA MODEL: SGLFLOW CONDENSING FUEL: DUAL FUEL 50 Hz YEAR: 2008 QUANTITY: 1 Learn More -
TT-6503 COMPLETE GE LM2500, 23MW, 13.8KV, 60Hz, YEAR 1990TT-6503 COMPLETE GE LM2500, 23MW, 13.8KV, 60Hz, YEAR 1990 WELL MAINTAINED GOVERNMENT FACILITY. YEAR 1990 OPERATED AS STANDBY (UTILITY BLACK START) WITH ANNUAL HOURS OF LESS THAN 1200 HOURS PER YEAR. LAST RUN IN 2020. THESE UNITS ARE CURRENTLY CONFIGURED FOR DIESEL FUEL OPERATION. WE CAN CONVERT TO NATURAL GAS FOR AN ADDITIONAL FEE AND APPROXIMATELY 14 WEEKS LEAD TIME. DETAILED INSPECTION AND FAIR MARKET VALUE ASSESSMENT (FINANCE CREDIT WORTHY) HAVE BEEN COMPLETED WITHIN THE LAST 6 MONTHS. Learn More -
YY-2894 NEW SIEMENS SGT 400, YEAR 2018YY-2894 NEW SIEMENS SGT 400, YEAR 2018 SIEMENS SGT 400 (12.9 MW) GAS TURBINE · 11-STAGE COMPRESSOR, 6 COMBUSTION CHAMBERS, 2-STAGE POWER TURBINE · GAS FUEL SYSTEM · DLE COMBUSTION SYSTEM · HOT-END DRIVE · 2-SHAFT ENGINE · LEFT-HAND EXHAUST · MAIN LUBRICATION PUMP · EQUIVALENT OPERATING HOURS : 0H · TOTAL STARTS : 0 · NEW, NEVER INSTALLED OR COMMISSIONED QUANTITY: 1 Learn More -
TT-2177 GAS BASED COMBINED CYCLE POWER PLANT, 116 MW, YEAR 2021TT-2177 GAS BASED COMBINED CYCLE POWER PLANT, 116 MW, YEAR 2021 GENERAL ELECTRIC GAS TURBINE GAS TURBINE MODEL NUMBER: GE, 6FAG QUANTITY: 1 Learn More -
TT-8593 GE TM2500GEN08 MOBILE GAS TURBINE GENERATOR, 10.5KV, YEAR 2025TT-8593 GE TM2500GEN08 MOBILE GAS TURBINE GENERATOR, 10.5KV, YEAR 2025 1. GE TM2500GEN08 2. YEAR: JUNE 2025 3. 10.5KV 4. DUAL FREQUENCY 5. DUAL FUEL 6. DRY LOW EMISSION 7. HOURS: 0 8. WARRANTY: ONE YEAR QUANTITY: 1 Learn More -
TT-7587 SIEMENS TG50D5/W701DS GAS TURBINE GENERATOR, 127.8 MW, YEAR 1995TT-7587 SIEMENS TG50D5/W701DS GAS TURBINE GENERATOR, 127.8 MW, YEAR 1995 1. SIEMENS WESTINGHOUSE TG50D5/W701DS 127.8 MW GAS TURBINE GENERATOR PACKAGES FOR SALE. THE TURBINE PACKAGES TOGETHER OFFER 255 MW READY TO SHIP EQUIPMENT. THIS TECHNOLOGY IS ONE OF THE MOST WIDESPREAD MIDDLE SIZE ENGINES (100-104 MW) FOR POWER GENERATION AND THE ONLY TURBINE OF ITS SIZE THAT CAN OPERATE ON HEAVY FUEL OIL (HFO). 2. THE UNITS ARE OFFERED WITH SOME OF THE REQUIRED BALANCE OF PLANT BY SEPARATE NEGOTIATION. 3. THESE UNITS WERE INSTALLED AND OPERATED IN A POWER STATION FROM 1996 UNTIL THE END OF 2004, WHEN THEY WERE DISMANTLED AS THE RESULT OF A PLANT UPGRADE. THE UNITS WERE PURCHASED AND UPGRADED BY THE BUYER TO 127.8 MW NOMINAL CAPACITY EACH. THEY ALSO FULLY REFURBISHED THE UNITS TO ZERO HOURS. THE TURBINES HAVE THE CAPABILITY OF BEING ABLE TO SWITCH BETWEEN NATURAL GAS AND LIQUID FUEL WHILE STILL OPERATING UNDER LOAD. QUANTITY: 2 Learn More -
K-8157 COAL FIRED POWER PLANT (2 X 50MW)K-8157 COAL FIRED POWER PLANT (2 X 50MW)
ENERGY BOILERS (CAE)
TURBINE SYSTEMS
STEAM TURBINES (TA) - DSL ARE 50 - 1
-CONDENSING TURBINE WITH TWO ADJUSTABLE OUTLETS, SUCH AS "ACTING" ON A SINGLE LINE OF TREES, DESIGNED TO DRIVE THE AC GENERATOR DIRECT-TYPE TH 60-2
-IS COMPOSED OF TWO BODIES: THE BODY OF HIGH PRESSURE (CIP) AND MEDIUM AND LOW PRESSURE BODY (CMP + CJP)
-HAS TWO ADJUSTABLE OUTLETS (PLUG SOCKETS AND PLUG HEATING) AND FIVE FIXED DOSES REGENERATIVE CIRCUIT FEEDSQUARES OF 600 CARS OVER T/H (WITH BUCKET WHEEL AND ARM LENGTH 12 M) - 4 PCS
-TIP HAMMER CRUSHERS CCA - 160 TO 2 PIECES
- RUBBER BANDS COAL TRANSPORTTHE MAIN EQUIPMENT IS ADDED TO ENSURE PROPER OPERATION FOLLOWING:
- SOLID FUEL STORAGE
- INSTALLATIONS AND INDUSTRIAL WATER SUPPLIES AND WASTEWATER DISCHARGE
- INSTALLATION OF EXHAUST HYDRAULIC SLAG
- WATER TREATMENT STATION
TO USE COAL, WEIGHT 88%, 12% NATURAL GASQUANTITY: 1
Learn More -
The TM 2500 Mobile Gas Turbine GeneratorThe TM 2500 Mobile Gas Turbine Generator Standard Description Quantity: 2 Units Available Immediately. Learn More