YY-3559 13 MW SIEMENS SGT-400 NATURAL GAS TURBINE GENSET 22 PICES 2022 NEW – UNUSED
DETAILS:
1. MANUFACTURER SIEMENS
2. MODEL SGT-400
3. YEAR 2022
4. CONDITION NEW
5. CATEGORY NATURAL GAS TURBINES
6. SUBCATEGORIES 10 - 99 MW
7. WATTAGE 13 MW
8. HOURS ZERO
9. FREQUENCY 50 Hz
10. FUEL TYPE NATURAL GAS
11. VOLTAGE 230 V
12. SIZE (L X W X H) 14.0 X 3.1 X 4.3 M
13. WEIGHT APPROX. 84 TON Learn More
YY-3558 13 MW SIEMENS SGT-400 NATURAL GAS TURBINE GENSET 12 PICES 2022 NEW UNUSED
DETAILS:
1. MANUFACTURER SIEMENS
2. MODEL SGT-400
3. YEAR 2022
4. CONDITION NEW
5. CATEGORY NATURAL GAS TURBINES
6. SUBCATEGORIES 10 - 99 MW
7. WATTAGE 13 MW
8. HOURS ZERO
9. FREQUENCY 50 Hz
10. FUEL TYPE NATURAL GAS
11. VOLTAGE 230 V
12. SIZE (L X W X H) 14.0 X 3.1 X 4.3 M
13. WEIGHT APPROX. 84 TON
Learn More
TT-1418 SOLAR TITAN 130 GAS TURBINE, 50Hz / 60Hz, YEAR 2007
SOLAR TITAN 130 GAS TURBINE
15,000KWE
11,170 RPM / 60Hz
11,197 RPM / 50Hz
FUEL GAS
QUANTITY: 1
Learn More
J-3004
FIBRILLATED RAFFIA TAPE EXTRUSION LINE – NEW, 120mm
PP FIBRILLATED YARN EXTRUDER LINE
MODEL: NOVASTAR-120
EXTRUSION LINE FOR PRODUCTION OF PP FIBRILLATED YARN
RAW MATERIAL: PP GRANULE
FINISHED PRODUCTS: NON-TWISTED TAPE YARN, FIBRILLATED YARN FOR TWINE
RANGE OF PRODUCT: 10,000 TO 30,000 DENIER
10000 DENIER APPROXIMATELY 17 TO 19 YARN
16000 DENIER APPROXIMATELY 11 TO 12 YARN
22000 DENIER APPROXIMATELY 8 TO 9 YARN
28000 DENIER APPROXIMATELY 6 TO 7 YARN
32000 DENIER APPROXIMATELY 5 TO 6 YARN
EXTRUSION THROUGHPUT: 300 KG PER HOUR
EXTRUSION CAPACITY: 180 TO 250 KG PER HOUR (PRODUCT CAPACITY DEPEND ON FILAMENT SIZE)
EXTRUDER SCREW DIAMETER: Ø 120mm
T-DIE WIDTH: 1300mm
TAKE-OFF ROLLER WIDTH: 1200mm
TAKE-OFF LINE SPEED: 160 METERS PER MINUTE (MAXIMUM)
OPERATION SIDE: RIGHT TO LEFT, OR LEFT TO RIGHT Learn More
YY-2894 NEW SIEMENS SGT 400, YEAR 2018
SIEMENS SGT 400 (12.9 MW) GAS TURBINE
· 11-STAGE COMPRESSOR, 6 COMBUSTION CHAMBERS, 2-STAGE POWER TURBINE
· GAS FUEL SYSTEM
· DLE COMBUSTION SYSTEM
· HOT-END DRIVE
· 2-SHAFT ENGINE
· LEFT-HAND EXHAUST
· MAIN LUBRICATION PUMP
· EQUIVALENT OPERATING HOURS : 0H
· TOTAL STARTS : 0
· NEW, NEVER INSTALLED OR COMMISSIONED
QUANTITY: 1
Learn More
V-2170 GENERAL ELECTRIC (GE) STEAM TURBINE 615MW FOR PRODUCING ELECTRICITY
STEAM TURBINE ONLY IS BEING OFFERED FOR SALE
UNIT DETAILS:
TURBINE SERIAL NUMBER: 270T764
GENERATOR SERIAL NUMBER: 290T764
RPM: 3600
TURBINE:
DESIGN CODE: G12
CONTROL SYSTEM: MARK VI
STAGES: 22
LSB LENGTH: 30”
INITIAL STEAM TEMPERATURE: 1050F
INITIAL STEAM PRESSURE: 3,515 PSIA
EXHAUST PRESSURE: 3.45 HGA
GENERATOR:
CODE: L2D
RATING: 750,000 KVA
VOLTAGE: 21,000
POWER FACTOR: .9
AMPS: 20,620
EXCITER RATING/VOLTS: 605
AMOUNT OF STEAM NEEDED: 4,200,000 TONS PER HOUR, 3500 PSI
YEAR OF THE MACHINE: MANUFACTURED BETWEEN 2009 AND 2016 (IT TAKES 5 TO 6 YEARS TO PRODUCE IT)
TYPE OF STEAM TURBINE: IS IT A BACK PRESSURE OR EXTRACTION STEAM TURBINE TO PRODUCE LOW PRESSURE AND MEDIUM PRESSURE STEAM? [ANSWER]
LOW AND MEDIUM STEAM PRESSURES IN PSI: [ANSWER]
AMOUNT OF STEAM AVAILABLE FROM EACH PRESSURE LEVEL (IN POUNDS OR TONS): [ANSWER]
SHIPPING DIMENSIONS: IT WILL OCCUPY A BULK SPACE FOR APPROXIMATELY 2500 TONS WEIGHT. IN ESSENCE, 25,000 TON SHIP NEEDS TO BE ENGAGED AND MOVING.
QUANTITY: 1
Learn More