Search results for: 'natural gas turbine generator 60 h'
- Related search terms
- gas fi
- Generator'
- Gas e
- Generator po
- Generator powe
- TT-4529 GENERAL ELECTRIC TURBINE GENERATOR – NEW, NATURAL GAS, 90MW, 60Hz, 7EA + HRSG COGENERATION PLANT, YEAR 2015TT-4529 GENERAL ELECTRIC TURBINE GENERATOR – NEW, NATURAL GAS, 90MW, 60Hz, 7EA + HRSG COGENERATION PLANT, YEAR 2015 EQUIPMENT OVERVIEW NEW / NEVER-USED SURPLUS MANUFACTURED IN 2015 GE 71 EA 91.95 MW NATURAL GAS TURBINE GE 7A6 121000 KVA 60 Hz 13000 V AIR-COOLED GENERATOR COMPLETE WITH ACCESSORY BASE AND ANCILLARY EQUIPMENT OPTIONALLY AVAILABLE HEAT RECOVERY STEAM GENERATOR (HRSG) AND ANCILLARY EQUIPMENT CRATED AND PRESERVED TO OEM SCHEDULE IN CLIMATE CONTROLLED WAREHOUSES Learn More
- C-3994 BARGEMOUNTED POWER PLANT, CAPACITY 220MW
C-3994 BARGEMOUNTED POWER PLANT, CAPACITY 220MW
A. ONCE THROUGH STEAM GENERATOR
B. BARGE
C. CHILLERS
D. AIR COMPRESSOR
E. GAS TURBINE
F. STEAM TURBINE
G. FEEDWATER SYSTEM
H. CLOSED COOLING WATER SYSTEM
I. AUXILIARY COOLING WATER SYSTEM
J. CONDENSATE POLISHING UNIT (CPU)
K. WASTE WATER SYSTEM
L. PLANT ELECTRICAL SYSTEM
M. BLACK START DG SET
N. PLANT CONTROLS AND INSTRUMENTATION
O. PLANT FIRE FIGHTING SYSTEM
P. START UP VACUUM SYSTEM
Q. STEAM TURBINE DEAERATING CONDENSERQUANTITY: 1 PLANT
Learn More - M-4835 POWER AND INDUSTRIAL PLANTS FOR SALEREFERENCE NUMBER: M-4835 (1111VEHJXX10) L POWER AND INDUSTRIAL PLANTS FOR SALE QTY. OUTPUT (MW) DESCRIPTION MANUFACTURER/ TYPE BUILT/ CONDITION 1 230 COMBINED CYCLE GAS TURBINE POWER PLANT SIEMENS V94-2 1988 1 220 COMBINED CYCLE POWER PLANT 50 HZ, FUEL: DUAL FUEL (NATURAL GAS OR HFO/DIESEL) GE FRAME 6B CCPP 1992, RUNNING HOURS: 135 000, PREUSED 1 180 GAS TURBINE 125 MW, STEAM TURBINE 55 MW, 50 HZ, FUEL LFO AND NG GE FRAME 9E CCPP 2005, RUNNING HOURS: 2000 2 128 COMPLETE POWER PLANTS, 15 KV, FUEL: NATURAL GAS AND LIGHT OIL GE FRAME PG9171E NEW 2 127 GAS TURBINE PACKAGES FIAT AVIO MODEL TG 50 – D5 1998,DISMANTLED, OVERHAULED, UPGRADED FROM SIEMENS AND DISMANTLED 2 125 COMPLETE PLANT, 2 UNITS ABB GAS TURBINE PACKAGES, FUEL: DUAL FUEL, 50 HZ ABB, 50WT 18H-66 1995, JUST OVERHAULED, WARRANTY POSSIBLE 1 93 COMBINED CYCLE POWER PLANT. FUEL : NATURAL GAS GE FRAME 6FA 1997 MAJOR INSPECTION IN 2009 1 73 COMBINED CYCLE POWER PLANT. FUEL: NATURAL GAS. 50 HZ. SIEMENS WESTINGHOUSE AND MITSUBISHI. 1999, RUNNING HOURS 97 000 1 70 COMBINED CYCLE POWER PLANT THOMASSEN/ABB 2009, RUNNING HOURS UNDER 90 000 CONDITION GOOD, 2009 OVERHAULED 5 66 GAS TURBINE PACKAGES, 50 OR 60 HZ ROLLS ROYCE, TRENT 60 2014, RUNNING HOURS ZERO 3 49 GAS TURBINE POWER PLANT, 50 HZ 3 UNITS GE LM 6000 PC 2004, RUNNING HOURS 6000 QTY. OUTPUT (MW) DESCRIPTION MANUFACTURER/ TYPE BUILT/ CONDITION 1 46 COMPLETE PLANT, INCLUDES 5 GAS TURBINE PACKAGES, INCLUDING 1 STEAM TURBINE, BOILER AND AUXILIARIES. FUEL: NATURAL GAS AND NAPHTA. 50 HZ. SIEMENS TYPHOON AND ALSTOM. 2000, LOW HOURS, STILL IN OPERATION 1 42 COMBINED CYCLE POWER PLANT. FUEL: NATURAL GAS. 50 HZ. GE LM 6000PA 1997, LAST HOT END OVERHAUL WAS AT 86.080 HOURS IN AUG 2010 1 41 GAS TURBINE PACKAGE WITH HRSG, 50HZ FUEL: NATURAL GAS/FUEL OIL THOMASSEN PG-6541 1995, LAST OVERHAUL AT 118350 1 40 COMBINED CYCLE POWER PLANT. FUEL: NATURAL GAS AND LIGHT OIL. 50 HZ. GE FRAME 6 B, DRY LOW NOX 1992, RECENTLY OVERHAULED, STILL GOOD FOR MORE THAN 24.000 RUNNING HOURS. READY TO SHIP. 5 37 GAS TURBINE PACKAGES, DUAL FUEL, 50/60 HZ SGT 750 SIEMENS NEW, ZERO HOURS 1 31,2 GAS TURBINE PACKAGES, 31,2 MW , 50/60 HZ, SGT 700 NEW, ZERO HOURS 5 31 GAS TURBINE PACKAGES, DUAL FUEL, 50/60 HZ GE TM2500 NEW 1 29,65 GAS TURBINE GENERATOR, 50 HZ, 11 KV SGT 700 2011, RUNNING HOURS ZERO (NEW) 1 27 COMBINED CYLE POWER PLANT, 27 MW, NATURAL GAS GE RLM 2500 PE AND ALSTOM STEAM TURBINE GAS TURBINE 1994, STEAM TURBINE 1996 1 26,59 GAS TURBINE, FUEL: GAS FRAME 5, PG-5371 PA 1995, RUNNING HOURS 174,104 4 24,6 CORE ENGINE FUEL: NATURAL GAS, 50 HZ SIEMENS SGT 600 (EX ABB GT 10B) 1994-1997, ZERO HOUR OVERHAULED 1 16 GAS TURBINE PACKAGE DUEAL FUEL ROLLS ROYCE AVON 1534-102L ZERO HOUR OVERHAULED IN 2008 1 14,25 NATURAL GAS ENGINE SOLAR TITAN 130 SOLONOX, 50 HZ TURBOMACH T19501 2007, ZERO RUNNING HOURS, AS NEW 3 12,9 GAS TURBINES SIEMENS, 60 HZ SIEMENS SGT 400 2014, NEW NEVER USED 1 11,86 GAS TURBINE, 60 HZ SOLAR MARS 100 15000 SOLONOX 1996, RUNNING HOURS 34 000 SINCE LAST OVERHAUL 2 9,2 CHP PLANT ELECTRIC, NATURAL GAS AND LIGHT DIESEL&BOTH SOLAR CENTAUR 50 T5701 2005 AND 2008, RUNNING HOURS 26 000 AND 2 500 1 8,8 COMBINED CYCLE GAS TURBINE POWER PLANT. 60 HZ. SOLAR MARS 90. 1989, LAST MAJOR OVERHAUL IN 2004, ONLY 1225 RUNNING HOURS 1 7,5 NATURAL GAS ENGINE SOLAR TAURUS T70, 50 HZ TURBOMACH SOLONOX + WHRB 2007, ZERO RUNNING HOURS AS NEW 1 5,5 GAS TURBINE, 50 HZ, NATURAL GAS SGT 200 1989, RUNNING HOURS 126 340 QTY. OUTPUT (MW) DESCRIPTION MANUFACTURER/ TYPE BUILT/ CONDITION 1 5,2 DUAL NATURAL GAS AND OIL ENGINE TAURUS 60, 50 HZ SOLAR TAURUS 60, SOLONOX T7301 1998, RUNNING HOURS17 700 1 1,4 GAS TURBINE PACKAGE INCL. HRSG, 50 HZ KAWASAKI KA 1334 1995, RUNNING HOURS AFTER MAJOR OVERHAUL 4000 Learn More
- J-4722 GE LM6000 PA GAS TURBINE, 42 MW, 50 Hz, DUAL FUEL, 10,500 VOLTSJ-4722 GE LM6000 PA GAS TURBINE, 42 MW, 50 Hz, DUAL FUEL, 10,500 VOLTS MAKE: GE MODEL: LM6000 PA YEAR: 1993 42 MW 50 Hz DUAL FUEL 10,500 VOLTS CONDITION: USED, 12,000 HOURS QUANTITY: 1 Learn More
- K-8157 COAL FIRED POWER PLANT (2 X 50MW)
K-8157 COAL FIRED POWER PLANT (2 X 50MW)
ENERGY BOILERS (CAE)
TURBINE SYSTEMS
STEAM TURBINES (TA) - DSL ARE 50 - 1
-CONDENSING TURBINE WITH TWO ADJUSTABLE OUTLETS, SUCH AS "ACTING" ON A SINGLE LINE OF TREES, DESIGNED TO DRIVE THE AC GENERATOR DIRECT-TYPE TH 60-2
-IS COMPOSED OF TWO BODIES: THE BODY OF HIGH PRESSURE (CIP) AND MEDIUM AND LOW PRESSURE BODY (CMP + CJP)
-HAS TWO ADJUSTABLE OUTLETS (PLUG SOCKETS AND PLUG HEATING) AND FIVE FIXED DOSES REGENERATIVE CIRCUIT FEEDSQUARES OF 600 CARS OVER T/H (WITH BUCKET WHEEL AND ARM LENGTH 12 M) - 4 PCS
-TIP HAMMER CRUSHERS CCA - 160 TO 2 PIECES
- RUBBER BANDS COAL TRANSPORTTHE MAIN EQUIPMENT IS ADDED TO ENSURE PROPER OPERATION FOLLOWING:
- SOLID FUEL STORAGE
- INSTALLATIONS AND INDUSTRIAL WATER SUPPLIES AND WASTEWATER DISCHARGE
- INSTALLATION OF EXHAUST HYDRAULIC SLAG
- WATER TREATMENT STATION
TO USE COAL, WEIGHT 88%, 12% NATURAL GASQUANTITY: 1
Learn More - TT-6503 COMPLETE GE LM2500, 23MW, 13.8KV, 60Hz, YEAR 1990TT-6503 COMPLETE GE LM2500, 23MW, 13.8KV, 60Hz, YEAR 1990 WELL MAINTAINED GOVERNMENT FACILITY. YEAR 1990 OPERATED AS STANDBY (UTILITY BLACK START) WITH ANNUAL HOURS OF LESS THAN 1200 HOURS PER YEAR. LAST RUN IN 2020. THESE UNITS ARE CURRENTLY CONFIGURED FOR DIESEL FUEL OPERATION. WE CAN CONVERT TO NATURAL GAS FOR AN ADDITIONAL FEE AND APPROXIMATELY 14 WEEKS LEAD TIME. DETAILED INSPECTION AND FAIR MARKET VALUE ASSESSMENT (FINANCE CREDIT WORTHY) HAVE BEEN COMPLETED WITHIN THE LAST 6 MONTHS. Learn More
- YY-3556 4 X 60 MW GE LM6000 PD 15PPM SPRINT GAS TURBINE POWER PLANTYY-3556 4 X 60 MW GE LM6000 PD 15PPM SPRINT GAS TURBINE POWER PLANT HISTORY: THE POWER PLANT CONSISTS OF X 50 MW GE LM6000 PD 15PPM SPRINT GAS TURBINE, ALL OF YEAR: 2011, 7000 HRS SINCE NEW EACH, 3000 RPM, 50 Hz, X 13 MW SIEMENS SST 300 STEAM TURBINE WITH 5000 HOURS EACH. PLANT WAS COMMISSIONED AND PUT INTO OPERATION IN 2012. QUNATITY: 1 Learn More
- The TM 2500 Mobile Gas Turbine GeneratorThe TM 2500 Mobile Gas Turbine Generator Standard Description Quantity: 2 Units Available Immediately. Learn More
- TT-1886 KAWASAKI PU4000B-ER GAS TURBINE POWER PLANT 51.2MW 60Hz, (16 X 3.2MW), YEAR 2008TT-1886 KAWASAKI PU4000B-ER GAS TURBINE POWER PLANT 51.2MW 60Hz, (16 X 3.2MW), YEAR 2008 KAWASAKI PU4000B-ER GAS TURBINE POWER PLANT 51.2MW 60Hz (16 X 3.2MW) MAIN SPECIFICATIONS GAS TURBINE MODEL: M1T-23 BRAND: KAWASAKI POWER OUTPUT: 3,200KWE FREQUENCY & VOLTAGE: 60Hz & 6600V YEAR OF PRODUCTION: 2008 RUNNING HOURS: ABOUT 60 HOURS FUEL OIL: NATURAL GAS PLANT AUXILIARY EQUIPMENT: 1 SET Learn More
- R-9389 GE 7EA GAS TURBINE GENERATOR 60HZ PACKAGES
REFERENCE NUMBER: R-9389
GE 7EA GAS TURBINE GENERATOR 60HZ PACKAGES
GE 7EA GAS TURBINE GENERATOR PACKAGES
85MW ISO EACH ON NATURAL GAS
THEY ARE IN STORAGE RIGHT NOW
OWNER HAD THEM SHIPPED BACK TO THE USA ABOUT A YEAR AGO.
THEY ARE UNUSED (NEVER FIRED) AND WERE BUILT IN 2008 BY GENERAL ELECTRIC
GE 7EA (PG7121) DUAL LIQUID FUEL TURBINES
HEAT RATE: 10,430 BTU/KWH
OUTPUT: 85MW ISO ON NATURAL GAS
CURRENTLY DUAL LIQUID FUEL- CRUDE (PRIMARY FUEL) AND DISTILLATE (BACK UP)
QUANTITY: 2
Learn More