Search results for: 'natural gas generator 6'
-
TT-8062 GE MS-5001-PA GENERATOR SET - NEW, 26MW, NATURAL GAS, 60 Hz, YEAR 2014TT-8062 GE MS-5001-PA GENERATOR SET - NEW, 26MW, NATURAL GAS, 60 Hz, YEAR 2014 1. GE NATURAL GAS GENERATOR 2. NEW 26MW 3. IT IS 60 Hz UNIT. NOT ECONOMICAL TO CONVERT TO 50 Hz 4. NEW 5. NEVER INSTALLED Learn More -
TT-8253 MWM 2032V16, 4.2 MW EACH, NATURAL GAS, YEAR 2009, 50HzTT-8253 MWM 2032V16, 4.2 MW EACH, NATURAL GAS, YEAR 2009, 50Hz 1. BRAND: MWM 2. MODEL: 2032V16 3. FUEL: NATURAL GAS 4. YEAR OF CONSTRUCTION: 2009 5. OPERATING HOURS: 41,600 (AVERAGE) 6. MAJOR OVERHAUL E60: 2015 (AT AVERAGE 33.600 HOURS) 7. MOTHBALLED: 2019 8. ALTERNATOR: AVK 9. FREQUENCY: 50Hz 10. VOLTAGE: 11 KV QUANTITY: 14 Learn More -
TT-4046 GENERAL ELECTRIC 7E.03 NATURAL GAS GENERATOR PACKAGE, 86.5 MW, YEAR 2014TT-4046 GENERAL ELECTRIC 7E.03 NATURAL GAS GENERATOR PACKAGE, 86.5 MW, YEAR 2014 GENERAL ELECTRIC 7E.03 NATURAL GAS GENERATOR PACKAGE YEAR: 2014 HOUSED: YES, IN A AMBIENT CONTROLLED WAREHOUSE IN TWO LOCATIONS WHAT DOESN’T HAVE TO BE INDOORS, IS OUTSIDE ON AN ENCLOSED FIELD, 2.5 HOURS AWAY FROM THE WAREHOUSES. SKIDDED: NO PASC CONDITION RATING: A CONDITION DETAILS: NEVER USED UNITS AVAILABLE: 1 CONNECTION STATUS: DISCONNECTED WARRANTY: NO WARRANTY DETAILS: EXP DEC 2018 Learn More -
TT-6503 COMPLETE GE LM2500, 23MW, 13.8KV, 60Hz, YEAR 1990TT-6503 COMPLETE GE LM2500, 23MW, 13.8KV, 60Hz, YEAR 1990 WELL MAINTAINED GOVERNMENT FACILITY. YEAR 1990 OPERATED AS STANDBY (UTILITY BLACK START) WITH ANNUAL HOURS OF LESS THAN 1200 HOURS PER YEAR. LAST RUN IN 2020. THESE UNITS ARE CURRENTLY CONFIGURED FOR DIESEL FUEL OPERATION. WE CAN CONVERT TO NATURAL GAS FOR AN ADDITIONAL FEE AND APPROXIMATELY 14 WEEKS LEAD TIME. DETAILED INSPECTION AND FAIR MARKET VALUE ASSESSMENT (FINANCE CREDIT WORTHY) HAVE BEEN COMPLETED WITHIN THE LAST 6 MONTHS. Learn More -
R-9389 GE 7EA GAS TURBINE GENERATOR 60HZ PACKAGESREFERENCE NUMBER: R-9389
GE 7EA GAS TURBINE GENERATOR 60HZ PACKAGES
GE 7EA GAS TURBINE GENERATOR PACKAGES
85MW ISO EACH ON NATURAL GAS
THEY ARE IN STORAGE RIGHT NOW
OWNER HAD THEM SHIPPED BACK TO THE USA ABOUT A YEAR AGO.
THEY ARE UNUSED (NEVER FIRED) AND WERE BUILT IN 2008 BY GENERAL ELECTRIC
GE 7EA (PG7121) DUAL LIQUID FUEL TURBINES
HEAT RATE: 10,430 BTU/KWH
OUTPUT: 85MW ISO ON NATURAL GAS
CURRENTLY DUAL LIQUID FUEL- CRUDE (PRIMARY FUEL) AND DISTILLATE (BACK UP)
QUANTITY: 2
Learn More -
TT-2177 GAS BASED COMBINED CYCLE POWER PLANT, 116 MW, YEAR 2021TT-2177 GAS BASED COMBINED CYCLE POWER PLANT, 116 MW, YEAR 2021 GENERAL ELECTRIC GAS TURBINE GAS TURBINE MODEL NUMBER: GE, 6FAG QUANTITY: 1 Learn More -
YY-2311 GE TM2500+ GENERATION 6 GENERATOR PACKAGE – 26 MW EACH, 11,000 V, 50/60 Hz, DIESEL OR NATURAL GAS, YEAR 2011YY-2311 GE TM2500+ GENERATION 6 GENERATOR PACKAGE – 26 MW EACH, 11,000 V, 50/60 Hz, DIESEL OR NATURAL GAS, YEAR 2011 -AT 50 Hz THE UNITS ARE DESIGNED TO PRODUCE 26 MW OF POWER -AT 60 Hz THE UNITS ARE DESIGNED TO PRODUCE 30 MW OF POWER -DEPENDING ON LOCATION TEMPERATURE -THESE ARE CONTINUOUS POWER UNITS DETAILS: 1. 31MW CONTINUOUS RATED (GE ADVERTISED AT ISO CONDITIONS); 2. YEAR OF MANUFACTURE: 2011; 3. PACKAGE SN: 2011-TM006 AND 2011-TM008; 4. CURRENTLY CONFIGURED AS 11KV 50HZ, YET CAN OPERATE AT EITHER 50HZ OR 60HZ; 5. 2 UNITS AVAILABLE; 6. EQUIPMENT IS CONFIGURED TO OPERATE ON LIQUID FUEL OR NATURAL GAS; 7. CURRENT OPERATING HOURS AS OF JULY 30, 2022: TM006 – 1726 HOURS TM008 – 2174 HOURS; 8. HOURS REFLECT TOTAL TIME SINCE NEW: HOURS MAY GO UP AS UNITS ARE STILL CONNECTED FOR EMERGENCY USE ONLY. 9. PRICE INCLUDES THE GT1 REPAIRS RECOMMENDED BY GE IN THE ATTACHED INVESTIGATIVE REPORT; 10. HPT REPLACEMENT ON GT1 ONLY: - LEAD TIME FOR REPAIRS IS 12-14 WEEKS BASED ON CURRENT AVAILABILITY (SUBJECT TO CHANGE); - SCOPE OF SUPPLY FOR EACH UNIT IS LISTED IN APPENDIX A. Learn More -
TT-1886 KAWASAKI PU4000B-ER GAS TURBINE POWER PLANT 51.2MW 60Hz, (16 X 3.2MW), YEAR 2008TT-1886 KAWASAKI PU4000B-ER GAS TURBINE POWER PLANT 51.2MW 60Hz, (16 X 3.2MW), YEAR 2008 KAWASAKI PU4000B-ER GAS TURBINE POWER PLANT 51.2MW 60Hz (16 X 3.2MW) MAIN SPECIFICATIONS GAS TURBINE MODEL: M1T-23 BRAND: KAWASAKI POWER OUTPUT: 3,200KWE FREQUENCY & VOLTAGE: 60Hz & 6600V YEAR OF PRODUCTION: 2008 RUNNING HOURS: ABOUT 60 HOURS FUEL OIL: NATURAL GAS PLANT AUXILIARY EQUIPMENT: 1 SET Learn More -
The TM 2500 Mobile Gas Turbine GeneratorThe TM 2500 Mobile Gas Turbine Generator Standard Description Quantity: 2 Units Available Immediately. Learn More -
YY-3556 4 X 60 MW GE LM6000 PD 15PPM SPRINT GAS TURBINE POWER PLANTYY-3556 4 X 60 MW GE LM6000 PD 15PPM SPRINT GAS TURBINE POWER PLANT HISTORY: THE POWER PLANT CONSISTS OF X 50 MW GE LM6000 PD 15PPM SPRINT GAS TURBINE, ALL OF YEAR: 2011, 7000 HRS SINCE NEW EACH, 3000 RPM, 50 Hz, X 13 MW SIEMENS SST 300 STEAM TURBINE WITH 5000 HOURS EACH. PLANT WAS COMMISSIONED AND PUT INTO OPERATION IN 2012. QUNATITY: 1 Learn More